Inspections for the day of: Thursday, December 4, 2014.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01539 FIRE-Final Inspection12/4/201412/4/201412/4/2014 3:36:10 PMPPASS
Life safety passed
FIR13-00723 INSP-Sprinkler Rough-in/Hydro12/4/201412/4/201412/4/2014 3:30:41 PMPPASS
overhead rough-in of the existing hanger passed
BLD14-02689 FIRE-Final Inspection12/4/201412/4/201412/4/2014 2:47:05 PMPFAIL
See approved plan sheet for list of items needed before occupancy of phase one and items needed before final sign off of permit. Items include installation of exit signs and emergency lighting, verification of racking permit, removal of dead bolts and verfication of annual sprinkler system inspection
FIR14-00454 INSP-Final Inspection12/3/201412/4/201412/4/2014 2:22:23 PMAPASS
Permit finaled
BLD14-02689 FIRE-Alarm Testing12/4/201412/4/201412/4/2014 2:21:41 PMPCANC
Wrong inspection type called in
BLD13-01688 FIRE-Final Inspection12/3/201412/4/201412/4/2014 2:20:49 PMAPART
Life safety will be ok to final when the project related fire sprinkler permit is finaled
BLD14-01964 FIRE-Final Inspection12/3/201412/4/201412/4/2014 1:00:28 PMAPASS
Life safety passed
BLD14-03268 FIRE-Conference12/3/201412/4/201412/4/2014 12:17:21 PMADONE
steve wanted to discuss fire rated corridors. I deferred him to the building inspector
FIR13-00683 INSP-Final Inspection12/3/201412/4/201412/4/2014 10:02:59 AMAPASS
Permit finaled
FIR13-00702 INSP-Final Inspection12/3/201412/4/201412/4/2014 9:17:32 AMAPASS
permit finaled
FIR14-00279 INSP-Final Inspection12/3/201412/4/201412/4/2014 9:17:00 AMAPASS
permit finaled