BLD14-01628
| BLD-Energy code compliance | 12/4/2014 | 12/4/2014 | 12/4/2014 4:10:49 PM | P | PART |
|
|
Looking for insulation cover inspection. Phone #: ###-#### Inspection requested via web by Derek Jackson. 5 inch mineral wool insulation at 3hr. firewall, south east half only.
|
BLD14-03194
| BLD-Ceiling Grid Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 3:33:31 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD14-01580
| BLD-Foundation | 12/3/2014 | 12/4/2014 | 12/4/2014 2:30:11 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD14-01964
| BLD-Final | 12/3/2014 | 12/4/2014 | 12/4/2014 2:09:34 PM | P | FAIL |
|
|
Joe Phone #: ###-####. Provide floor transitions from tile to concrete floors, remove the manual operated flush bolt from rear double door.
|
ESC14-00672
| Site Final | 12/4/2014 | 12/4/2014 | 12/4/2014 2:08:33 PM | P | DONE |
|
|
|
ESC14-00672
| DOC - Permit Finaled | 12/4/2014 | 12/4/2014 | 12/4/2014 2:08:25 PM | P | PASS |
|
|
|
BLD14-03217
| BLD-Foundation | 12/4/2014 | 12/4/2014 | 12/4/2014 1:29:20 PM | P | PASS |
|
|
|
BLD14-03217
| BLD-Foundation | 12/3/2014 | 12/4/2014 | 12/4/2014 11:22:13 AM | A | NR |
|
|
around 11 if possible// aldaro Phone #: ###-####
|
BLD14-02902
| BLD-Final | 12/3/2014 | 12/4/2014 | 12/4/2014 9:54:39 AM | A | FAIL |
|
|
Chris Phone #: ###-####. Provide tempered glazing inside light at conferance room.
|
BLD14-02095
| BLD-Ceiling Grid Inspection | 12/3/2014 | 12/4/2014 | 12/4/2014 9:22:01 AM | A | NR |
|
|
Keith Phone #: ###-####
|
BLD14-02226
| BLD-Framing/Rough-in | 12/3/2014 | 12/4/2014 | 12/4/2014 8:59:01 AM | A | PASS |
|
|
Jim Phone #: ###-####. Interior steel stud framed walls for new private offices.
|