FIR15-00848
| INSP-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 1:24:47 PM | P | PASS |
|
|
Permit finaled
|
BLD15-01259
| FIRE-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 12:56:12 PM | P | FAIL |
|
|
The sign and door lock are done but the duct smoke detectors will not be ready until Monday
|
BLD15-03635
| FIRE-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 10:17:00 AM | A | FAIL |
|
|
Fire alarm and fire sprinkler modifications are required due to new wall arrangements. This work will require permits.
|
BLD15-03623
| FIRE-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 10:16:17 AM | A | FAIL |
|
|
Fire alarm and fire sprinkler modifications are required due to new wall arrangements. This work will require permits.
|
BLD14-00544
| FIRE-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 10:14:48 AM | A | PASS |
|
|
Life safety passed. Per tim frost sprinkler protection not required under the tanks and distillery.
|
BLD15-03902
| FIRE-Final Inspection | 12/4/2015 | 12/4/2015 | 12/4/2015 9:42:38 AM | P | PASS |
|
|
Life safety passed
|
FIR15-00714
| INSP-Sprinkler Rough-in | 12/3/2015 | 12/4/2015 | 12/4/2015 9:41:19 AM | A | PASS |
|
|
Rough-in and tenting passed. Piping can be covered.
|
FIR15-00713
| INSP-Sprinkler Rough-in | 12/3/2015 | 12/4/2015 | 12/4/2015 9:40:41 AM | A | PASS |
|
|
Rough-in and tenting passed and piping can be covered.
|
FIR15-00712
| INSP-Sprinkler Rough-in | 12/3/2015 | 12/4/2015 | 12/4/2015 9:24:05 AM | A | PASS |
|
|
Under ground supply line is ok to cover
|
FIR15-00711
| INSP-Sprinkler Rough-in | 12/3/2015 | 12/4/2015 | 12/4/2015 9:23:16 AM | A | PASS |
|
|
Under ground supply line is ok for cover
|