BLD17-01477
| BLD-Final | 12/1/2017 | 12/4/2017 | 12/5/2017 7:26:41 AM | A | PASS |
|
|
Ed Phone #: ###-####
|
BLD17-01810
| BLD-Wall Bracing | 12/4/2017 | 12/4/2017 | 12/5/2017 7:24:49 AM | P | PART |
|
|
Shear // John Phone #: ###-#### ext ok to cover but need to check hold downs at framing
|
BLD17-00583
| BLD-Ceiling Grid Inspection | 12/1/2017 | 12/4/2017 | 12/4/2017 8:06:51 PM | A | NR |
|
|
A grid inspection on 5th flour and a ceiling insulation on 5th floor as well Phone #: ###-#### Inspection requested via web by David Banks
|
BLD17-03183
| BLD-Foundation | 12/1/2017 | 12/4/2017 | 12/4/2017 8:06:20 PM | P | DONE |
|
|
Please call ahead for access, requesting after 3 - Clint Phone #: ###-####
|
BLD17-02224
| BLD-Ceiling Grid Inspection | 12/4/2017 | 12/4/2017 | 12/4/2017 2:20:19 PM | P | PASS |
|
|
Mechanical re-inspection scheduled for this afternoon as well. More seismic wires were needed on diffusers. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD17-00216
| BLD-Final | 12/1/2017 | 12/4/2017 | 12/4/2017 2:19:34 PM | P | PASS |
|
|
Zach Phone #: ###-####
|
BLD06-03306
| BLD-Aging Inspection | 12/4/2017 | 12/4/2017 | 12/4/2017 1:16:34 PM | | PASS |
|
|
|
BLD06-03305
| BLD-Aging Inspection | 12/4/2017 | 12/4/2017 | 12/4/2017 1:13:54 PM | | PEND |
|
|
|
BLD15-02043
| BLD-Wall cover | 12/1/2017 | 12/4/2017 | 12/4/2017 10:19:01 AM | A | PASS |
|
|
Inspection request for shaft covering in trash room level 1. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|