Inspections for the day of: Tuesday, December 4, 2018.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00686 INSP-Sprinkler Rough-in/Hydro12/4/201812/4/201812/4/2018 2:00:52 PMPCANC
Inspection request was suppose to be scheduled for 05DEC2018 per conversation with point of contact. This request is cancelled and will be rescheduled by POC.

Ron Phone #: ###-####
FIR18-00716 INSP-Sprinkler Rough-in/Hydro12/4/201812/4/201812/4/2018 1:11:24 PMPPART
Hydrostatic test for levels 1 and 3 witnessed, no pressure loss observed at riser gauges, hydro was completed with glycerine anitfreeze. Level 2 to be completed at a later date.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00716 INSP-Sprinkler Rough-in12/4/201812/4/201812/4/2018 11:01:28 AMAPART
Tenting inspection complete for level 3, level 3 overhead fire sprinkler piping approved for cover. Where piping crosses breezeway freeze protection will be required, rough in will not be signed off until freeze protection is inspected.
BLD18-02990 FIRE-Final Inspection12/3/201812/4/201812/4/2018 10:25:48 AMAPASS
No fire sprinklers, smoke detectors are stand-alone and not monitored, fire exitnguisher will be placed under sink as discussed. Final life fire safety inspection for area of work complete.

Brandon Phone #: ###-####