Inspections for the day of: Tuesday, December 4, 2018.
Number of inspections: 9
Percentage of inspections complete: 78 %
Percentage of inspections not complete: 22 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00302 Site Final11/30/201811/30/2018 P 
ESC18-01102 Conference11/30/201812/3/2018 A 
ESC18-00309 BMP Violation11/30/201812/4/201812/12/2018 2:29:09 PMACANC
ESC16-00406 General Inspection11/27/201812/4/201812/11/2018 11:24:28 AMAPASS
check on storm drain DI bag maintenance and lot 9, block 2 erosion

DI bags have been cleaned out and/or replaced with new sediment bags.

Area of erosion from runoff from lot 9 has had landscaping and rockery installed to stabilize area.

Approved. Wintery conditions, no SFH violations or discharges occurring.
ESC18-00123 General Inspection12/4/201812/4/201812/6/2018 8:52:12 AM CANC
rescheduled for site final
ESC17-01465 General Inspection12/4/201812/4/201812/4/2018 8:32:36 AM CANC
ESC17-01125 General Inspection12/4/201812/4/201812/4/2018 8:31:15 AM CANC
ESC17-00925 Aging Inspection12/4/201812/4/201812/4/2018 8:30:34 AM CANC
ESC18-00492 General Inspection11/13/201812/4/201812/3/2018 3:18:09 PMAFAIL
No construction entrance. Employees and material loading occuring in the mud off Rose HIll. DI bags installed, but need a stabilized construction access.