Inspections for the day of: Wednesday, December 4, 2019.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00910 ELE-Aging Inspection12/4/201912/4/201912/6/2019 7:47:36 AM FAIL
multiple attempts made
homeowner noncompliant
ELE16-00261 ELE-Aging Inspection12/4/201912/4/201912/5/2019 8:06:08 AM FAIL
corrections need addressed and access needed for inspection

680 GFCI protection required for hot tubs (breaker in-op)
356.12 LFNC shall not be used where subject to physical damage
ELE19-04671 Permanent Service12/4/201912/4/201912/4/2019 2:12:58 PMPPASS
Changed out damaged panel Phone #: ###-#### Inspection requested via web by Matthew White...p/s u/g reconnect ok
ELE19-04489 Final12/4/201912/4/201912/4/2019 1:40:28 PMPPASS
Permanent Service was already passed - This is a final inspection on service only. Phone #: ###-#### Inspection requested via web by Kendra Lanham...corrections made..ok to final
ELE19-03368 Electrical Rough-In12/3/201912/4/201912/4/2019 1:24:50 PMPPASS
Ceiling cover inspection. Phone #: ###-#### Inspection requested via web by Stuart Welton..
grid ok to cover
ELE19-04639 Final12/3/201912/4/201912/4/2019 12:41:40 PMPFAIL
Added a 240 volt 50 amp circuit and rerouted circuit and added 4 outlet. Please call technician drew with any questions @ ###-####. Phone #: ###-#### Inspection requested via web by William Salts...no access
ELE18-04746 Final12/3/201912/4/201912/4/2019 11:29:41 AMAPASS
Please call 30 mins prior as electrician is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...job complete...ok to final
ELE18-04746 Electrical Rough-In12/4/201912/4/201912/4/2019 11:29:33 AMAPASS
Please call 30 mins prior as electrician is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...grid complete...main hallway
ELE19-04657 Electrical Rough-In12/3/201912/4/201912/4/2019 10:48:47 AMANR
Justin Metcalf ###-####
This inspection is just for the underground conduit ran from the house to the shed. Phone #: ###-#### Inspection requested via web by Samatha Solberg...trench not complete and pipe install not complete
ELE19-04430 Rough-In Permanent Service12/3/201912/4/201912/4/2019 10:32:15 AMAPASS
The building is located behind the house. Phone #: ###-#### Inspection requested via web by Nermin Bobaric...
rough in ok to cover...using existing subpanel fed from house...unable to verify bedroom layout-rm full of insulation
ELE19-04381 Electrical Rough-In12/3/201912/4/201912/4/2019 10:04:36 AMAPASS
ring me on the way so I can meet you. ###-####. Thanks Phone #: ###-#### Inspection requested via web by Kurtis Moore..full rough-in complete
ELE19-04454 Electrical Rough-In12/3/201912/4/201912/4/2019 9:34:27 AMAPASS
Floor heat inspect. Door code bike Phone #: ###-#### Inspection requested via web by Greg Idsinga...ok to cover
ELE19-00030 Final12/3/201912/4/201912/4/2019 9:09:45 AMAPART
Partial Final for Service Department Phone #: ###-#### Inspection requested via web by Bryan Atkins..back shop and exterior condtioning units, required GFCI protection verified...ok to final...breaker ties need verified, permanent panel labels, and sprinkler bond to building steel by complete final
ELE19-02671 Final12/3/201912/4/201912/4/2019 8:33:06 AMAPASS
Some of the occupancy sensor switches are vacancy. Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
corrections made...ok to final...no card onsite
ELE19-03798 Final12/3/201912/4/201912/4/2019 8:13:26 AMAPASS
Brent Phone #: ###-####...ok to final