BLD19-00655
| BLD-Aging Inspection | 12/4/2019 | 12/4/2019 | 12/5/2019 3:09:01 PM | | CANC |
|
|
|
BLD19-03214
| BLD-Framing/Rough-in | 12/4/2019 | 12/4/2019 | 12/4/2019 4:40:51 PM | P | PASS |
|
|
Jeff Phone #: ###-####//corrections made//framing and insulation ok//
|
BLD19-04697
| BLD-Final | 12/2/2019 | 12/4/2019 | 12/4/2019 3:41:05 PM | P | PASS |
|
|
Shaun Phone #: ###-####//no changes to existing//matches floor plan//occupancy ok//
|
BLD19-03197
| BLD-Framing/Rough-in | 12/4/2019 | 12/4/2019 | 12/4/2019 3:17:50 PM | P | PASS |
|
|
Jeff Phone #: ###-####//corrections made//engineering provided for trusses installed backwards--gussetts nailing and added webs installed per engineering//ok to insulate//
|
BLD19-02327
| BLD-Final | 12/4/2019 | 12/4/2019 | 12/4/2019 2:43:35 PM | P | FAIL |
|
|
Jamie Phone #: ###-####//CN issued add handrail back steps and ramps//verify parking is ok with zoning//
|
BLD17-03168
| BLD-Final | 12/2/2019 | 12/4/2019 | 12/4/2019 2:05:07 PM | P | NR |
|
|
Chit Phone #: ###-####//need to add sink drain cover per description on two bathrooms//
|
BLD19-03388
| BLD-Other | 12/4/2019 | 12/4/2019 | 12/4/2019 12:58:49 PM | P | PASS |
|
|
Autin- sheer nail outside of house- pl;ease call prior if possible Phone #: ###-####
|
MIS19-00345
| BLD-Conference | 12/4/2019 | 12/4/2019 | 12/4/2019 12:39:53 PM | A | DONE |
|
|
met with Joe, discussed reason for violation//issued notice of violation 5 day//check back on day six//
|
BLD19-02732
| BLD-Final | 12/3/2019 | 12/4/2019 | 12/4/2019 11:23:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Naida Khan
|
BLD19-02732
| DOC - Permit Finaled | 12/4/2019 | 12/4/2019 | 12/4/2019 11:23:09 AM | P | PASS |
|
|
|
BLD19-04511
| BLD-Footing | 12/3/2019 | 12/4/2019 | 12/4/2019 11:16:03 AM | A | PART |
|
|
already discussed the setbacks//want to see them drill in the rock anchors///set backs ok//pin in back of lot, inside fence, bumped building forward to meet plans//still may be issues with the rock anchors being installed//
|
BLD19-00538
| BLD-Concrete | 12/3/2019 | 12/4/2019 | 12/4/2019 10:19:42 AM | A | PART |
|
|
This inspection is for the stem walls for the garbage enclosures around the site. There are are 5 in total. The pour is at 11, please come as close to 10am as possible. Phone #: ###-#### Inspection requested via web by Matt Perry//first 4 trash enclosure stem wall ok, pending specials//
|
BLD18-03143
| BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 9:42:27 AM | A | DONE |
|
|
Stairwell review Phone #: ###-#### Inspection requested via web by Mike Beeson
|