BLD95-02043
| INSP - Footings | 12/5/1995 | 12/5/1995 | 12/5/1995 12:00:00 AM | | PASS |
|
|
/ / 342 - cleaning out of snow, water and mud
|
BLD95-00241
| INSP - Framing/Rough-in | 12/4/1995 | 12/5/1995 | 12/5/1995 12:00:00 AM | A | FAIL |
|
|
12/05/95 342 - 8:30 APT. 3 page c/n. basically not doing 1 hr constructi compromised corridor and 2 hr area separation walls.
|
BLD95-00241
| INSP - Conference | 12/4/1995 | 12/5/1995 | 12/5/1995 12:00:00 AM | A | PART |
|
|
12/05/95 342 - 8:30 APT. 2 1/2 hr conf with a 3 pg c/n issued on framing
|
BLD95-00513
| INSP - Conference | 12/5/1995 | 12/5/1995 | 12/5/1995 12:00:00 AM | P | PASS |
|
|
12/05/95 342 - CALL MARK HOWARD ###-####
|
BLD95-00784
| INSP - Final | 12/5/1995 | 12/5/1995 | 12/5/1995 12:00:00 AM | P | CANC |
|
|
12/05/95 342 - ANYTIME AFTER 3:30 could not get up hill due to snow
|
BLD95-02043
| INSP - Foundation | 12/5/1995 | 12/5/1995 | 12/5/1995 12:00:00 AM | P | PASS |
|
|
12/05/95 342 -
|