Inspections for the day of: Thursday, December 5, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-03570 Final12/3/200212/5/200212/5/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/03/2002 at 11:06:37. Contact: ###-####. corrections NEC250.8, 680.26(C)(1), & 680.26(B)(1) (cover, barrier, & cover) 12/5/2002 10:25:18 AM
ELE02-03753 Rough-In Permanent Service12/4/200212/5/200212/5/2002 12:00:00 AMAPASS
calvin ###-#### ok cover ri p/s o/h n ok 12/5/2002 8:53:34 AM
ELE02-03756 Rough-In Permanent Service12/4/200212/5/200212/5/2002 12:00:00 AMAPASS
don ###-#### ok cover ri p/s u/g n ok 12/5/2002 10:29:00 AM
ELE02-03755 Final12/4/200212/5/200212/5/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/04/2002 at 15:34:05. Contact: ###-####. contractor cancelled 12/5/2002 10:28:37 AM
ELE02-03492 Final12/4/200212/5/200212/5/2002 12:00:00 AMPNR
###-#### wrong phone number should be ###-#### called left message house not ready 12/5/2002 1:24:16 PM
ELE02-03760 Rough-In Permanent Service12/5/200212/5/200212/5/2002 12:00:00 AMPPASS
###-#### ok cover ri p/s u/g n ok 12/5/2002 3:22:55 PM
ELE01-00508 Electrical Rough-In12/5/200212/5/200212/5/2002 12:00:00 AMPPASS
pool lights ###-#### ok pool ligths potting 12/5/2002 3:54:24 PM
ELE02-03301 Final12/5/200212/5/200212/5/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 12/05/2002 at 11:19:31. Contact: ###-####. wrong type inspection 12/5/2002 12:43:02 PM
ELE02-03301 Permanent Service12/5/200212/5/200212/5/2002 12:00:00 AMPDONE
jess ###-#### no inpection IPCO already connected power contractor to call in for final when job completed 12/5/2002 4:33:55 PM