ELE06-03275
| Final | 12/5/2006 | 12/5/2006 | 12/5/2006 5:14:30 PM | P | PASS |
|
|
code marks on boiler ok, ok to final, signed occ card
|
ELE05-04325
| Electrical Rough-In | 12/5/2006 | 12/5/2006 | 12/5/2006 4:01:13 PM | P | PART |
|
|
jason ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith 1st floor guest rooms anop walls only ok to cover
|
ELE06-03472
| Final | 12/5/2006 | 12/5/2006 | 12/5/2006 2:52:35 PM | P | PASS |
|
|
Home owner will be home from 12 - 2:30pm. Please call home owner to varify (###-####) ; Phone #: ###-#### Internet Inspection Request from: Tollie Rogers ok to final
|
ELE06-04465
| Electrical Rough-In | 12/4/2006 | 12/5/2006 | 12/5/2006 2:13:09 PM | P | PASS |
|
|
Home owner will be there after 12:30pm. Thanks Jack. Joe; Phone #: ###-#### Internet Inspection Request from: Joseph Zumwalt bath ric ok
|
ELE06-03033
| Permanent Service | 12/5/2006 | 12/5/2006 | 12/5/2006 1:29:58 PM | P | PASS |
|
|
les ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith p/s u/g n ok
|
ELE06-04443
| Rough-In Permanent Service | 12/5/2006 | 12/5/2006 | 12/5/2006 11:37:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 6:12:32 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE06-03883
| Electrical Rough-In | 12/4/2006 | 12/5/2006 | 12/5/2006 9:39:35 AM | A | PASS |
|
|
Trench needs inspected for cover behind the garage, Thanks; Phone #: ###-#### Internet Inspection Request from: Jamie Winters u/g ok to cover
|
ELE05-02003
| Final | 12/4/2006 | 12/5/2006 | 12/5/2006 8:18:37 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 12:03:01 PM. Contact: ###-####. 2nd fl rooms anop ok to final
|
ELE06-04404
| Conference | 12/4/2006 | 12/5/2006 | 12/4/2006 4:05:50 PM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 9:12:51 AM. Contact: ###-####. talked about dedicated panel space and requirement of no foreign systems in space
|