BLD06-03000
| FIRE-Final Inspection | 12/4/2006 | 12/5/2006 | 12/5/2006 3:06:14 PM | A | CANC |
|
|
Final pending project related alarm permit inspection scheduled for 12/6.
|
FIR06-00951
| INSP-Final Inspection | 12/5/2006 | 12/5/2006 | 12/5/2006 3:03:25 PM | P | DEFR |
|
|
Rescheduled for 12/6 am per phone call with contractor.
|
FIR06-00725
| INSP-Sprinkler Rough-in | 12/4/2006 | 12/5/2006 | 12/5/2006 2:49:53 PM | P | PART |
|
|
Sprinkler rough-in is okay for cover at the drop ceilings.
|
FIR06-00496
| INSP-Sprinkler Rough-in/Hydro | 12/4/2006 | 12/5/2006 | 12/5/2006 2:44:16 PM | A | PART |
|
|
AG hydrostatic test completed satisfactory.
|
FIR06-00927
| INSP-Sprinkler Rough-in/Hydro | 12/4/2006 | 12/5/2006 | 12/5/2006 2:43:26 PM | A | FAIL |
|
|
Heads are overspaced to an adjacent wall as installed at pod #3. Sprinkler rough-in is acceptable for cover at the drop ceilings in pod #6.
|
BLD06-00981
| FIRE-Final Inspection | 12/1/2006 | 12/5/2006 | 12/5/2006 12:08:04 PM | A | FAIL |
|
|
Door hardware as installed at the second exit to the roof from the common corridor is not approved.
|
BLD06-02129
| FIRE-Final Inspection | 12/4/2006 | 12/5/2006 | 12/5/2006 12:06:43 PM | A | FAIL |
|
|
Need to repair the exit signs and emergency lighting in the warehouse area, provide address numbers per fire code review notes, remove the manual thumbturn at the main entry/exit door, provide a current annual fire sprinkler system inspection to be completed by a licensed contractor.
|