ESC06-00400
| Random Inspection | 12/5/2007 | 12/5/2007 | 12/5/2007 3:03:48 PM | P | PART |
|
|
Worker parking area and material storage needs source controls to reduce mud trackout onto 13th
|
ESC07-01269
| Random Inspection | 12/5/2007 | 12/5/2007 | 12/5/2007 2:29:50 PM | A | PART |
|
|
Follow up: Overall the site is aging well. Signs of a few minor failures on the slopes and at the consruction entrance. Will continue to monitor.
|
ESC07-01155
| Site Preparation | 12/5/2007 | 12/5/2007 | 12/5/2007 11:23:12 AM | A | NR |
|
|
Work has not started. Talked to contractor. Informed him that prior to start of construction that the City of Boise will need to be notified. A site preparation inspection will be required.
|
ESC07-01486
| Conference | 12/4/2007 | 12/5/2007 | 12/5/2007 11:22:39 AM | A | DONE |
|
|
Meet with RP & Contractor: Reviewed site, need bmps installed per plan. Discussed dewatering, cons. entrance, sediment barriers and need to stabilize bare ground when construction ceases over 14 days. NOI by developers has been filed, contractor has yet to file. Requested that 48 hour notice of intent to start construction be given when ready.
|
ESC07-00904
| Conference | 12/4/2007 | 12/5/2007 | 12/4/2007 9:16:20 AM | A | CANC |
|
|
|