ELE07-03930
| Final | 12/5/2007 | 12/5/2007 | 12/5/2007 5:27:39 PM | P | PASS |
|
|
jill Note:pick up kids at school 3:15-3:45 Phone #: ###-#### . 1. final ok. .
|
ELE07-03799
| Final | 12/5/2007 | 12/5/2007 | 12/5/2007 4:23:18 PM | P | PASS |
|
|
pat Phone #: ###-#### . 1. final ok. .
|
ELE07-04029
| Electrical Rough-In | 12/5/2007 | 12/5/2007 | 12/5/2007 3:13:44 PM | P | PASS |
|
|
wes Phone #: ###-#### . 1. ri ok. . . 2. floors and walls only. .
|
ELE07-01624
| Electrical Rough-In | 12/5/2007 | 12/5/2007 | 12/5/2007 2:14:27 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 10:23:35 AM. Contact: ###-####.
|
ELE07-03970
| Rough-In Permanent Service | 12/5/2007 | 12/5/2007 | 12/5/2007 1:33:02 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 11:21:43 AM. Contact: ###-####. . 1. See the other inspections for this date. .
|
ELE07-03970
| Electrical Rough-In | 12/5/2007 | 12/5/2007 | 12/5/2007 1:32:22 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 11:21:43 AM. Contact: ###-####. . 1. ri is ok. . . 2. The address is not entirely correct, it needs to be suite 100. . . 3. No further inspections will be done until correction is made. .
|
ELE07-03970
| Permanent Service | 12/5/2007 | 12/5/2007 | 12/5/2007 1:27:28 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 11:21:43 AM. Contact: ###-####. . 1. p/s u/g n ok. . . 2. A meter is all that is needed for this location. .
|