BLD03-01020
| BLD-Aging Inspection | 12/5/2008 | 12/5/2008 | 12/9/2008 5:15:07 PM | | DONE |
|
|
Okay for final
|
BLD08-01092
| FIRE-Final Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 6:28:43 PM | P | NH |
|
|
Contractor not available on site.
|
FIR08-00039
| INSP-Sprinkler Rough-in/Hydro | 12/5/2008 | 12/5/2008 | 12/5/2008 6:25:51 PM | P | PART |
|
|
Rough-in okayed for cover.
|
FIR08-00622
| INSP-Final Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 6:25:02 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR07-00928
| INSP-Sprinkler Rough-in | 12/5/2008 | 12/5/2008 | 12/5/2008 6:24:33 PM | P | PART |
|
|
Field verified resubmitted plans for changes at the 7th floor, noted corrections have been completed, see plans for annotations regarding today's inspection. Overhead install at the 7th floor okay for cover.
|
BLD08-02064
| FIRE-Conference | 12/5/2008 | 12/5/2008 | 12/5/2008 12:16:53 PM | A | DONE |
|
|
Regarding plan review notes addressing door hardware and signage at the 2nd floor balconies.
|
FIR08-00696
| INSP-Alarm Testing | 12/5/2008 | 12/5/2008 | 12/5/2008 12:14:52 PM | A | FAIL |
|
|
See field inspection notes 11/12
|
FIR08-00622
| FIR-Aging Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 12:11:34 PM | | DONE |
|
|
Permit scheduled for doc final.
|
BLD08-02227
| FIRE-Final Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 11:19:38 AM | A | NR |
|
|
Need project related fire sprinkler and alarm permit finals prior.
|
BLD08-02265
| FIRE-Final Inspection | 12/4/2008 | 12/5/2008 | 12/5/2008 11:17:39 AM | A | PASS |
|
|
Fire life safety inspection passed for the scope of building remodel work.
|