MIS07-00033
| MIS-Aging Inspection | 12/3/2008 | 12/5/2008 | 12/5/2008 4:36:40 PM | A | FAIL |
|
|
Did not receive call back as was previously noted. I have set a bldg. conferance for Monday in the AM and will discuss with Bldg. official on how to proceed further.
|
BLD08-00399
| BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 4:34:26 PM | P | NR |
|
|
|
BLD08-01127
| BLD-Framing/Rough-in | 12/5/2008 | 12/5/2008 | 12/5/2008 4:33:57 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/5/2008 at 8:44:02 AM. Contact: ###-####.
|
BLD08-00418
| BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 2:57:17 PM | P | PART |
|
|
OK for temp occ. Still needs to provide additional ada signage, instal vertical grab bars in restrooms and repair handrail in storage room, not bein utilized at this time.
|
BLD08-02137
| BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 2:10:40 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/5/2008 at 10:50:06 AM. Contact: ###-####.
|
BLD08-02137
| DOC - Permit Finaled | 12/5/2008 | 12/5/2008 | 12/5/2008 2:10:31 PM | P | PASS |
|
|
Letter of compliance issued.
|
ESC08-00621
| General Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 1:59:30 PM | P | PASS |
|
|
|
BLD08-01073
| BLD-Energy code compliance | 12/5/2008 | 12/5/2008 | 12/5/2008 1:59:19 PM | P | PASS |
|
|
les Phone #: ###-####
|
BLD08-01073
| BLD-Framing/Rough-in | 12/5/2008 | 12/5/2008 | 12/5/2008 1:59:01 PM | P | PASS |
|
|
les Phone #: ###-####
|
BLD08-02284
| BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 1:37:24 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/5/2008 at 8:14:19 AM. Contact: ###-####. remove locking hardware from door and provide lever type or panic hardware. c/n posted.
|
BLD08-00418
| BLD-Final | 12/4/2008 | 12/5/2008 | 12/5/2008 11:32:25 AM | A | DEFR |
|
|
carl Phone #: ###-####
|
BLD08-02123
| BLD-Foundation | 12/3/2008 | 12/5/2008 | 12/5/2008 11:16:54 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/3/2008 at 3:18:10 PM. Contact: ###-####.
|
ESC08-00843
| Random Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 11:16:41 AM | A | PASS |
|
|
|
BLD08-02169
| BLD-Conference | 12/4/2008 | 12/5/2008 | 12/5/2008 11:01:21 AM | A | DONE |
|
|
Meeting with contractor,architect and overhead door installer at 10:00am. Met on site with contractor, architect and dorr installer. Went over issues listed on c/n. Architect to provide revised drawings and submit to plan review.
|