FIR13-00233
| INSP-Final Inspection | 12/5/2013 | 12/5/2013 | 12/18/2013 5:01:32 PM | P | PART |
|
|
partial final - Jonathan Phone #: ###-####
|
FIR13-00233
| INSP-Alarm Testing | 12/4/2013 | 12/5/2013 | 12/18/2013 5:00:05 PM | P | PART |
|
|
|
FIR13-00661
| INSP-Sprinkler Rough-in | 12/4/2013 | 12/5/2013 | 12/6/2013 6:51:46 AM | A | DEFR |
|
|
Would it be possible to have this inspection anywhere from 9-noon. Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
BLD13-00938
| FIRE-Final Inspection | 12/4/2013 | 12/5/2013 | 12/5/2013 12:15:31 PM | A | NR |
|
|
early as poss // use permit to occupy the 7th floor // Jim Phone #: ###-#### *Completed on site walkthrough with G. Goldsmith, T. Gainor, and general contractors. Project is not in condition for occupancy at this time due to construction underway and site work in progress.*
|