Inspections for the day of: Thursday, December 5, 2013.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00410 INSP-Sprinkler Rough-in/Hydro12/5/201312/5/201312/5/2013 7:37:33 PMPFAIL
The hydro test failed for a second time. There is visible leakage at the left hand riser flow switch. Not sure where the leak is on the right hand riser.
FIR13-00609 INSP-Sprinkler Rough-in12/4/201312/5/201312/5/2013 7:35:24 PMPPART
See the city approved plans for locations of hard lids where sprinkler piping can be covered. I spoke with Nate and the project superintendant about the NON-rated wood that has been installed that will require fire protection. Also a mechanical mezzanine exits that may need additional fire protection in the surrounding areas.
FIR13-00260 INSP-Sprinkler Rough-in12/4/201312/5/201312/5/2013 11:22:47 AMAPASS
Underground flush passed
FIR13-00410 INSP-Sprinkler Rough-in12/4/201312/5/201312/5/2013 11:22:14 AMAFAIL
Hydro test failed due to visible drop in pressure at the guages.
BLD13-02796 FIRE-Final Inspection12/4/201312/5/201312/5/2013 12:00:00 AMACANC
Nate Phone #: ###-####

nate called in and canceled ///12-5-13ps