FIR13-00410
| INSP-Sprinkler Rough-in/Hydro | 12/5/2013 | 12/5/2013 | 12/5/2013 7:37:33 PM | P | FAIL |
|
|
The hydro test failed for a second time. There is visible leakage at the left hand riser flow switch. Not sure where the leak is on the right hand riser.
|
FIR13-00609
| INSP-Sprinkler Rough-in | 12/4/2013 | 12/5/2013 | 12/5/2013 7:35:24 PM | P | PART |
|
|
See the city approved plans for locations of hard lids where sprinkler piping can be covered. I spoke with Nate and the project superintendant about the NON-rated wood that has been installed that will require fire protection. Also a mechanical mezzanine exits that may need additional fire protection in the surrounding areas.
|
FIR13-00260
| INSP-Sprinkler Rough-in | 12/4/2013 | 12/5/2013 | 12/5/2013 11:22:47 AM | A | PASS |
|
|
Underground flush passed
|
FIR13-00410
| INSP-Sprinkler Rough-in | 12/4/2013 | 12/5/2013 | 12/5/2013 11:22:14 AM | A | FAIL |
|
|
Hydro test failed due to visible drop in pressure at the guages.
|
BLD13-02796
| FIRE-Final Inspection | 12/4/2013 | 12/5/2013 | 12/5/2013 12:00:00 AM | A | CANC |
|
|
Nate Phone #: ###-####
nate called in and canceled ///12-5-13ps
|