ELE18-03802
| Electrical Rough-In | 12/4/2018 | 12/5/2018 | 12/5/2018 3:44:25 PM | P | PASS |
|
|
Randy. Ceiling Cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy North and east corridor and areas n.e. grid rough in ok cover
|
ELE18-00835
| Final | 12/5/2018 | 12/5/2018 | 12/5/2018 2:38:19 PM | P | PASS |
|
|
Al Phone #: ###-#### Final ok
|
ELE18-04143
| Rough-In Permanent Service | 12/5/2018 | 12/5/2018 | 12/5/2018 1:59:42 PM | P | PASS |
|
|
we will make the connections to the main breakers as soon as we can get Idaho Power out to remove the meters so we can access the breakers. Thanks Phone #: ###-#### Inspection requested via web by Rick Beckman Permit for all 5 units damaged. Addresses do not match plot plan provided by GIS. South unit on west duplex and 4 units of south west "L" shaped building rough in ok cover p/s u/g rec ok
|
ELE18-03597
| Final | 12/3/2018 | 12/5/2018 | 12/5/2018 10:20:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Final ok
|
ELE18-03597
| Electrical Rough-In | 12/5/2018 | 12/5/2018 | 12/5/2018 9:49:21 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Listing and disconnecting means confirmed. Rough in ok
|
ELE18-04117
| Electrical Rough-In | 12/4/2018 | 12/5/2018 | 12/5/2018 9:48:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M Trauma 2 wall to left of entrance remodeled. Rough in ok cover
|
ELE18-04558
| Electrical Rough-In | 12/4/2018 | 12/5/2018 | 12/5/2018 9:09:32 AM | A | PASS |
|
|
JR. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Ofiice located thru south double door near south end of building. Wall rough in ok cover.
|
ELE14-01021
| Final | 12/3/2018 | 12/5/2018 | 12/5/2018 8:42:51 AM | A | PASS |
|
|
Call Mike Cole with any questions. Phone #: ###-#### Inspection requested via web by Bonnie Page Final ok
|