MEC96-03690
| INSP - Gas pressure test | 12/6/1996 | 12/6/1996 | 12/9/1996 12:00:00 AM | P | PASS |
|
|
12/09/96 350 - PHONE NUMBER FOR ACCESS ###-#### pt ok final
|
MEC96-03750
| INSP - Gas pressure test | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | PASS |
|
|
/ / 350 - PRESSURE TEST PASSED FINAL
|
BLD1053857
| INSP - Energy code compliance | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | PASS |
|
|
/ / 350 - INSULATION OK ,OK TO COVER, WILL CHECK LANDINGS OF STAIRS ON SLOPE
|
MEC96-03690
| INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 350 - PT FAILED PRESSURE DOWN
|
MEC96-03690
| INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 350 - PT FAILED PRESSURE DOWN
|
BLD96-02675
| INSP - Letter of compliance | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | PASS |
|
|
/ / 350 - C/C #11914
|
BLD96-02675
| INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | PASS |
|
|
/ / 350 - FINAL
|
BLD96-02675
| INSP - Letter of compliance | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | PASS |
|
|
/ / 350 - C/C #11914
|
BLD96-02746
| INSP - Energy code compliance | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 350 - STILL NOT FINISHED
|
BLD96-03205
| INSP - Footings | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - ALREADY DONE 5/12/96
|
MEC96-02877
| INSP - Final | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - FINAL
|
MEC96-02877
| INSP - Final | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - FINAL
|
MEC96-03738
| INSP - Gas pressure test | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - EARLY A.M. PT OK FINAL
|
MEC96-03744
| INSP - Retro Fit (check note) | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - FURNACE AND GAS TEST OK FINAL
|
MEC96-03750
| INSP - Retro Fit (check note) | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | FAIL |
|
|
12/06/96 350 - GAS TEST/CALL PENNY AT TML-###-#### SO SHE CAN CALL OWNER YOU IN. PT FAILED PRESSURE DOWN
|
BLD96-02598
| INSP - Energy code compliance | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - INSULATION OK, OK TO COVER
|
BLD96-02645
| INSP - Framing/Rough-in | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | A | PASS |
|
|
12/06/96 350 - FRAME OK, OK TO INSULATE
|
BLD96-02645
| INSP - Energy code compliance | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PASS |
|
|
12/06/96 350 - INSULATION OK, OK TO COVER
|
BLD1053857
| INSP - Framing/Rough-in | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PART |
|
|
12/06/96 350 - FRAME OK, LANDINGS AT STAIRS EXCEED THE 1/4" IN 12" SLOPE CORRECTION NOTICE TO FIX BY FINAL
|
MEC96-03757
| INSP - Rough-in & Gas Pressure | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PASS |
|
|
12/06/96 350 - R/I OK PT OK
|
MEC96-03710
| INSP - Gas pressure test | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PASS |
|
|
12/06/96 350 - WHEN YOU GET THERE ASK FOR GINO..OR CALL ###-#### PRESSURE TEST OK
|
MEC96-03750
| INSP - Retro Fit (check note) | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PASS |
|
|
12/06/96 350 - re-inspection gas test FINAL
|
MEC96-03505
| INSP - Retro Fit (check note) | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PART |
|
|
12/06/96 350 - fire insert and pressure test late p.m. PT OK, DAMPER ON F/P STUCK CLOSED, NEED TO REMOVE OR BLOCK OPEN
|
BLD96-03223
| INSP - Footings | 12/5/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PASS |
|
|
12/06/96 350 - FTNS OK, NEED TO MAINTAIN 3" ON REBAR FROM GROUND
|
BLD96-02746
| INSP - Energy code compliance | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | FAIL |
|
|
12/06/96 350 - NOT READY STILL NEED TO INSULATE BEHIND TUB
|
BLD96-02675
| INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 12:00:00 AM | P | PASS |
|
|
final reinspect
|