PLM99-04035
| Plumbing Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 08:58:23. Contact: ###-####. R/I ok.
|
PLM99-03506
| Final | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 09:02:51. Contact: ###-####. Final ok.
|
PLM99-03575
| Plumbing Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | FAIL |
|
|
Steve ###-#### Provide loading on existing water line, provide plans, use approved hangers on wasted water in ceiling, nail plate, protect PEX from sharp studs above framed wall, provide FD for T&P drain or pipe to exterior with out trapping.
|
PLM99-04052
| Final | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PASS |
|
|
S/W final ok.
|
PLM99-03956
| Plumbing Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PART |
|
|
R/I in walls, UTR needs hanging, water service needs to be run.
|