BLD99-03386
| BLD-Foundation | 12/3/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 08:59:28. Contact: ###-####.
|
BLD99-02122
| BLD-Final | 12/3/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC99-04094
| Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | A | PASS |
|
|
|
BLD98-01343
| BLD-Energy code compliance | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PART |
|
|
Still need vapor barrier, talked with installer told him to comply ASAP as our office has made several inspections.
|
BLD99-03321
| BLD-Framing/Rough-in | 12/5/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/05/1999 at 10:15:12. Contact: ###-####. Unable to locate plans and truss details.
|
MEC99-03614
| Final | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 07:51:25. Contact: ###-####.
|
BLD99-03436
| BLD-Foundation | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PART |
|
|
###-####--mana found wall Ok except unable to verify horizontal rebar at garage footings.
|
MEC99-04075
| Final | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | FAIL |
|
|
for fn--for homeowner eddie-- ###-#### need TO CALL 1ST BEFORE INSP Corrections done, except vent connector thru-wall, need clearance and high temp sealant, called contractor left message.
|
MEC99-04008
| Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 11:00:48. Contact: ###-####.
|
MEC99-04008
| Pressure Test | 12/6/1999 | 12/6/1999 | 12/6/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 11:01:12. Contact: ###-####.
|
MEC99-04073
| Final | 12/2/1999 | 12/6/1999 | 12/2/1999 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 17:04:41. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/02/1999 at 17:19:10.
|