FIR00-00536
| INSP-Sprinkler Rough-in/Hydro | 11/30/2000 | 12/6/2000 | 12/6/2000 12:00:00 AM | A | FAIL |
|
|
###-####/// c/n issued 12/6/2000 10:16:19 AM
|
BLD99-02813
| FIRE-Final Inspection | 12/5/2000 | 12/6/2000 | 12/6/2000 12:00:00 AM | P | PASS |
|
|
Jeff, ###-####
|
FIR00-00513
| INSP-Sprinkler Rough-in | 12/6/2000 | 12/6/2000 | 12/6/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 409 On 12/6/2000 4:00:51 PM ///// heads overspaced in cathedral area; sprinklers required under stage; dry plans not on-site; insulation covering wet pipe 12/6/2000 4:03:13 PM
|