BLD01-00228
| BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 16:30:02. Contact: ###-####...need verify struct upgrade 12/6/2001 11:48:52 AM
|
BLD01-01418
| BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 16:31:14. Contact: ###-####...recall 12/6/2001 2:33:31 PM
|
BLD00-03649
| BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 16:32:16. Contact: ###-####....keep c/n, recall. 12/6/2001 11:50:03 AM
|
BLD01-01469
| BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 12/6/2001 11:44:08 AM gen'l walk-thru for shell only...need eng's/spec. insp reports & affidavits.
|
BLD01-01544
| BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 12/6/2001 11:47:31 AM glu-lam & int ftgs ok to delete as upper floor done w/attic trusses
|
BLD98-03705
| BLD-Foundation | 12/6/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 12/6/2001 12:02:36 PM Observed poured caissons at west ext wall line, MTI onsite, pending all reports, including geo-tech
|
BLD01-01521
| BLD-Conference | 12/6/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 12/6/2001 12:05:52 PM temp storefront ok (if compliant w/ 2406,UBC) while custom windows on back-order...for t/o
|
BLD01-00228
| BLD-Final | 12/6/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 340 On 12/6/2001 11:49:19 AM ###-#### per cont. 12/6/2001 2:56:12 PM
|
BLD01-02523
| BLD-Footing | 12/6/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/06/2001 at 11:14:02. Contact: ###-####....detached gar ftg ok. 12/7/2001 9:13:29 AM
|
BLD01-01634
| BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 15:18:07. Contact: ###-####...keep c/n, (spec insp seismic ties, complete firestops or box out pvc at bsmt lid.) ok for t/o 12/6/2001 12:50:22 PM
|