MEC05-03353
| Final | 12/6/2005 | 12/6/2005 | 12/7/2005 8:39:32 AM | P | PASS |
|
|
|
MEC05-03353
| Rough-in | 12/6/2005 | 12/6/2005 | 12/6/2005 4:12:38 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/6/2005 at 10:20:47 AM. Contact: ###-####.
|
MEC05-03997
| Final | 12/6/2005 | 12/6/2005 | 12/6/2005 3:40:41 PM | P | FAIL |
|
|
Paul will be home this afternoon. Would like a call before going out so he an schedule the rest of his day; Phone #: ###-#### Internet Inspection Request from: Aaron ..gasAlandt...gas flex connector to small..condensate tubing pinched.
|
MEC05-00205
| Final | 12/5/2005 | 12/6/2005 | 12/6/2005 3:28:57 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/5/2005 at 2:53:56 PM. Contact: ###-####....no access
|
MEC05-03558
| Final | 12/5/2005 | 12/6/2005 | 12/6/2005 2:15:22 PM | P | PASS |
|
|
Dixie, please call me before heading over here. ###-####, Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
MEC05-03605
| Rough-in | 12/6/2005 | 12/6/2005 | 12/6/2005 1:10:39 PM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Wade Huskey...covered with insulation..20lb gas test ok
|
MEC05-03605
| Pressure Test | 12/6/2005 | 12/6/2005 | 12/6/2005 1:09:42 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Wade Huskey
|
MEC05-00395
| Final | 12/2/2005 | 12/6/2005 | 12/6/2005 9:50:46 AM | A | PASS |
|
|
meet contractor at 9am//monica; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
MEC05-03164
| MEC-Aging Inspection | 12/6/2005 | 12/6/2005 | 12/6/2005 9:49:49 AM | | PASS |
|
|
wip
|
MEC04-03526
| Final | 12/2/2005 | 12/6/2005 | 12/6/2005 9:24:41 AM | A | PASS |
|
|
meet w/contractor at 9am//monica; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|