Inspections for the day of: Tuesday, December 6, 2005.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-03975 Final12/6/200512/6/200512/6/2005 12:21:24 PMPPASS
early if possible, building is iopen and has roof access ladder, any questions call Lynn at ###-####, thank you; Phone #: ###-#### Internet Inspection Request from: Stephanie Smith
MEC05-03990 Final12/5/200512/6/200512/6/2005 12:05:07 PMAPASS
for w/h-- paul-- ###-####
MEC05-03474 Final12/6/200512/6/200512/6/2005 11:54:42 AMPPASS
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
MEC05-03984 Rough-in12/5/200512/6/200512/6/2005 11:44:05 AMPPASS
This is for 2114 and 2116; one fireplace in each.; Phone #: ###-#### Internet Inspection Request from: Shelley Baisch
MEC05-03939 Rough-in12/5/200512/6/200512/6/2005 11:36:05 AMAPASS
Please call John, the homeowner, 30 Minutes prior to inspection. ###-#### or ###-####, Thank you, Karen; Phone #: ###-#### Internet Inspection Request from: Rick Lake
MEC05-03978 Pressure Test12/5/200512/6/200512/6/2005 9:39:02 AMAPASS
Randy is contact. Thanks.; Phone #: ###-#### Internet Inspection Request from: Mike Davisson
ok gas lines stubbed through ceiling at bathroom and tagged gas line to rtu at roof for suite at bottom.
MEC05-03415 Final12/5/200512/6/200512/6/2005 9:16:52 AMAPASS
Scheduled by a contractor via Hello! on 12/5/2005 at 9:55:24 AM. Contact: ###-####.
MEC05-03862 Pressure Test12/5/200512/6/200512/6/2005 9:04:47 AMAPASS
Scheduled by a contractor via Hello! on 12/5/2005 at 10:03:27 AM. Contact: ###-####.
MEC05-03862 Rough-in12/5/200512/6/200512/6/2005 9:04:31 AMAPASS
Scheduled by a contractor via Hello! on 12/5/2005 at 10:03:12 AM. Contact: ###-####.
MEC05-03863 Pressure Test12/5/200512/6/200512/6/2005 9:04:18 AMAPASS
Scheduled by a contractor via Hello! on 12/5/2005 at 10:04:16 AM. Contact: ###-####.
MEC05-03863 Rough-in12/5/200512/6/200512/6/2005 9:03:30 AMAPASS
Scheduled by a contractor via Hello! on 12/5/2005 at 10:03:54 AM. Contact: ###-####.
MEC05-03552 Final12/6/200512/6/200512/6/2005 12:00:00 AMAPASS