Inspections for the day of: Thursday, December 6, 2012.
Number of inspections: 33
Percentage of inspections complete: 97 %
Percentage of inspections not complete: 3 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-02510 BLD-Energy code compliance12/14/201211/30/2012 A 
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
BLD12-00683 BLD-Other12/6/201212/6/201212/6/2012 4:50:51 PMACANC
BLD12-00683 BLD-Other12/6/201212/6/201212/6/2012 4:49:31 PMPPART
Third floor fire partitions and shear walls. All dry wall is hung, needs to provide additional attachment on shear walls and fire partitions per the approved plans.
BLD12-01584 BLD-Wall cover12/6/201212/6/201212/6/2012 4:47:31 PMPNR
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD12-01584 BLD-Wall cover12/6/201212/6/201212/6/2012 4:47:13 PMPCANC
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
ESC12-00623 Tracking Control12/6/201212/6/201212/6/2012 2:54:58 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
ESC12-00614 Tracking Control12/6/201212/6/201212/6/2012 2:51:25 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
ESC12-00613 Tracking Control12/6/201212/6/201212/6/2012 2:51:08 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
ESC12-00612 Tracking Control12/6/201212/6/201212/6/2012 2:50:51 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
ESC12-00626 Tracking Control12/6/201212/6/201212/6/2012 2:50:36 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
ESC12-00625 Tracking Control12/6/201212/6/201212/6/2012 2:50:21 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
ESC12-00624 Tracking Control12/6/201212/6/201212/6/2012 2:49:41 PMPPART
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
BLD12-01575 BLD-Wall cover12/6/201212/6/201212/6/2012 2:45:14 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
BLD12-01574 BLD-Wall cover12/6/201212/6/201212/6/2012 2:44:28 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
BLD12-01573 BLD-Wall cover12/6/201212/6/201212/6/2012 2:43:50 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
BLD12-01587 BLD-Wall cover12/6/201212/6/201212/6/2012 2:43:07 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
ESC12-00625 Tracking Control12/6/201212/6/201212/6/2012 2:42:49 PMPCANC
BLD12-01586 BLD-Wall cover12/6/201212/6/201212/6/2012 2:40:52 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
BLD12-01586 BLD-Wall cover12/6/201212/6/201212/6/2012 2:39:16 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
BLD12-01585 BLD-Wall cover12/6/201212/6/201212/6/2012 2:38:34 PMAPASS
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
ESC12-01060 Random Inspection12/6/201212/6/201212/6/2012 2:35:03 PMPPASS
BLD12-02870 BLD-Foundation12/4/201212/6/201212/6/2012 2:34:49 PMPPASS
Phone #: 2086979868 >> Inspection requested via mobile web by Vern
ESC12-01058 Random Inspection12/6/201212/6/201212/6/2012 2:34:33 PMPPASS
BLD12-02868 BLD-Foundation12/6/201212/6/201212/6/2012 2:34:13 PMPPASS
ESC12-01064 Site Preparation12/6/201212/6/201212/6/2012 2:33:49 PMPPASS
BLD12-02875 BLD-Footing12/5/201212/6/201212/6/2012 2:33:32 PMPPASS
Phone #: 2086979868 >> Inspection requested via mobile web by Vern
BLD12-02871 BLD-Footing12/5/201212/6/201212/6/2012 2:32:50 PMPPASS
Phone #: 2086979868 >> Inspection requested via mobile web by Vern
ESC12-01062 Site Preparation12/6/201212/6/201212/6/2012 2:32:09 PMPPASS
BLD12-00680 BLD-Wall Bracing12/5/201212/6/201212/6/2012 12:42:41 PMAFAIL
Provide blocking at corridor walls, tighten all holdowns, re-nail all areas that were missed.
BLD12-01325 BLD-Final12/6/201212/6/201212/6/2012 12:40:01 PMANR
Please contact storemanager, Ben, in regards to paper work location. Phone #: ###-#### >> Inspection requested via web by Scott Munroe. Needs life safety inspection.
ESC12-00915 Site Final12/6/201212/6/201212/6/2012 9:18:23 AMADONE
ESC12-00915 DOC - Permit Finaled12/6/201212/6/201212/6/2012 9:18:16 AMPPASS
BLD12-02402 BLD-Final12/5/201212/6/201212/6/2012 9:18:05 AMAFAIL
Brett Phone #: ###-####. Provide the blower door test results and post or the third party airseal inspection report done at framing.