BLD12-02510
| BLD-Energy code compliance | 12/14/2012 | 11/30/2012 | | A | |
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD12-00683
| BLD-Other | 12/6/2012 | 12/6/2012 | 12/6/2012 4:50:51 PM | A | CANC |
|
|
|
BLD12-00683
| BLD-Other | 12/6/2012 | 12/6/2012 | 12/6/2012 4:49:31 PM | P | PART |
|
|
Third floor fire partitions and shear walls. All dry wall is hung, needs to provide additional attachment on shear walls and fire partitions per the approved plans.
|
BLD12-01584
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 4:47:31 PM | P | NR |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD12-01584
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 4:47:13 PM | P | CANC |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
|
ESC12-00623
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:54:58 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
ESC12-00614
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:51:25 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
ESC12-00613
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:51:08 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
ESC12-00612
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:50:51 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
ESC12-00626
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:50:36 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
ESC12-00625
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:50:21 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
ESC12-00624
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:49:41 PM | P | PART |
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
BLD12-01575
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:45:14 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
BLD12-01574
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:44:28 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
BLD12-01573
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:43:50 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
BLD12-01587
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:43:07 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
ESC12-00625
| Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 2:42:49 PM | P | CANC |
|
|
|
BLD12-01586
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:40:52 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
BLD12-01586
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:39:16 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
BLD12-01585
| BLD-Wall cover | 12/6/2012 | 12/6/2012 | 12/6/2012 2:38:34 PM | A | PASS |
|
|
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin. 5/8 type x rock, face layer ok, 2nd. floor.
|
ESC12-01060
| Random Inspection | 12/6/2012 | 12/6/2012 | 12/6/2012 2:35:03 PM | P | PASS |
|
|
|
BLD12-02870
| BLD-Foundation | 12/4/2012 | 12/6/2012 | 12/6/2012 2:34:49 PM | P | PASS |
|
|
Phone #: 2086979868 >> Inspection requested via mobile web by Vern
|
ESC12-01058
| Random Inspection | 12/6/2012 | 12/6/2012 | 12/6/2012 2:34:33 PM | P | PASS |
|
|
|
BLD12-02868
| BLD-Foundation | 12/6/2012 | 12/6/2012 | 12/6/2012 2:34:13 PM | P | PASS |
|
|
|
ESC12-01064
| Site Preparation | 12/6/2012 | 12/6/2012 | 12/6/2012 2:33:49 PM | P | PASS |
|
|
|
BLD12-02875
| BLD-Footing | 12/5/2012 | 12/6/2012 | 12/6/2012 2:33:32 PM | P | PASS |
|
|
Phone #: 2086979868 >> Inspection requested via mobile web by Vern
|
BLD12-02871
| BLD-Footing | 12/5/2012 | 12/6/2012 | 12/6/2012 2:32:50 PM | P | PASS |
|
|
Phone #: 2086979868 >> Inspection requested via mobile web by Vern
|
ESC12-01062
| Site Preparation | 12/6/2012 | 12/6/2012 | 12/6/2012 2:32:09 PM | P | PASS |
|
|
|
BLD12-00680
| BLD-Wall Bracing | 12/5/2012 | 12/6/2012 | 12/6/2012 12:42:41 PM | A | FAIL |
|
|
Provide blocking at corridor walls, tighten all holdowns, re-nail all areas that were missed.
|
BLD12-01325
| BLD-Final | 12/6/2012 | 12/6/2012 | 12/6/2012 12:40:01 PM | A | NR |
|
|
Please contact storemanager, Ben, in regards to paper work location. Phone #: ###-#### >> Inspection requested via web by Scott Munroe. Needs life safety inspection.
|
ESC12-00915
| Site Final | 12/6/2012 | 12/6/2012 | 12/6/2012 9:18:23 AM | A | DONE |
|
|
|
ESC12-00915
| DOC - Permit Finaled | 12/6/2012 | 12/6/2012 | 12/6/2012 9:18:16 AM | P | PASS |
|
|
|
BLD12-02402
| BLD-Final | 12/5/2012 | 12/6/2012 | 12/6/2012 9:18:05 AM | A | FAIL |
|
|
Brett Phone #: ###-####. Provide the blower door test results and post or the third party airseal inspection report done at framing.
|