Inspections for the day of: Friday, December 6, 2013.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00291 General Inspection12/3/201312/3/2013   
BLD13-02712 BLD-Footing12/6/201312/6/201312/9/2013 3:15:18 PMPFAIL
Wes Phone #: ###-#### on friday 11/6 ground was frozen crew removed frozen sub grade with picks and shovels air temp is 21deg crew useded a 6bag mix temp of concrete in forms at time of place ment 55deg crew covered with one R5 insulating blankit avg temps were below 20 with lows of 4 on sunday and -7 on monday
BLD13-02709 BLD-Footing12/6/201312/6/201312/9/2013 3:05:33 PMPPEND
Ready around 2:00--Thanks Dave Anton says have a good one! Phone #: ###-#### this footing was not poured as of 12/09/13
BLD13-02782 BLD-Wall Bracing12/6/201312/6/201312/9/2013 6:16:34 AMPPASS
Please inspect as early as possible. Thanks. Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD13-02796 BLD-Final12/5/201312/6/201312/9/2013 6:15:49 AMPPASS
Nate Phone #: ###-####
BLD13-03344 BLD-Final12/5/201312/6/201312/6/2013 12:07:41 PMANR
Brenna ###-####
BLD13-02786 BLD-Final12/5/201312/6/201312/6/2013 12:07:13 PMANR
kelly Phone #: ###-####
BLD13-03205 BLD-Framing/Rough-in12/5/201312/6/201312/6/2013 10:29:52 AMAPASS
russ Phone #: ###-####
BLD13-03177 DOC - Permit Finaled12/6/201312/6/201312/6/2013 8:06:20 AMPPASS