FIR16-00244
| INSP-Sprinkler Rough-in | 11/30/2016 | 12/6/2016 | 12/7/2016 7:05:04 AM | P | DONE |
|
|
Fire pump testing complete
|
FIR16-00555
| INSP-Final Inspection | 12/5/2016 | 12/6/2016 | 12/6/2016 3:58:48 PM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete.
|
FIR16-00489
| INSP-Final Inspection | 12/1/2016 | 12/6/2016 | 12/6/2016 3:58:16 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00266
| INSP-Final Inspection | 12/5/2016 | 12/6/2016 | 12/6/2016 3:57:48 PM | P | PART |
|
|
Partial final complete for overhead fire sprinkler system. Tampers and flow switches will be inspected during alarm inspection, heat chase was being installed for piping crossing the breezeway at time of this inspection. Chase heat for sprinkler piping will be verified during alarm/life safety inspection.
|
FIR15-00689
| INSP-Final Inspection | 12/5/2016 | 12/6/2016 | 12/6/2016 3:56:00 PM | P | PASS |
|
|
Final underground supply inspection passed/complete
|
BLD16-03210
| FIRE-Conference | 12/6/2016 | 12/6/2016 | 12/6/2016 1:25:13 PM | P | CANC |
|
|
Fire conference rescheduled for 10AM 07DEC16 per conversation with Mark Phone #: ###-####
|
BLD16-03812
| FIRE-Final Inspection | 12/6/2016 | 12/6/2016 | 12/6/2016 11:42:29 AM | P | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag, previously noted items have been repaired. Final life fire safety inspection for phase one passed/complete (Office area only, phase 2 is warehouse which was not inspected today)
|
BLD16-03675
| FIRE-Final Inspection | 12/5/2016 | 12/6/2016 | 12/6/2016 11:08:17 AM | A | PASS |
|
|
Final inspection for racking permit passed/complete
|
BLD16-02252
| FIRE-Final Inspection | 12/5/2016 | 12/6/2016 | 12/6/2016 10:18:53 AM | A | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection passed/complete.
|