ELE19-04696
| Electrical Rough-In | 12/6/2019 | 12/6/2019 | 12/6/2019 4:12:03 PM | P | PASS |
|
|
Go through gate on left side of house Please call Eric when on site ###-#### Phone #: ###-#### Inspection requested via web by Bonnie Page Cabana, firepit with sitting area, planters all located to west seperated from pool. New pavers being installed around existing pool, no equipotential bond required. Under ground rough in ok cover. Underground rough in ok cover
|
ELE19-04674
| Conference | 12/4/2019 | 12/6/2019 | 12/6/2019 3:37:42 PM | P | PASS |
|
|
Call me when your headed that way and I’ll meet you there thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Discussed the changing of 800 amp service, Available fault current for 25k rated mains, grounding electrode system, Fire sprinkler and water main both underground metal water pipes plus has ground rod at I-Line location.
|
ELE19-01406
| Electrical Rough-In | 12/6/2019 | 12/6/2019 | 12/6/2019 2:41:43 PM | P | PART |
|
|
Ceiling inspection game room and play room. Prefinal inspection for level 2A and level 1B Phone #: ###-#### Inspection requested via web by John Mittleider Game room and play room grid rough in ok cover. Checked guest rooms 211 thru 215, and 217, 218, 252 thru 262. All checked ok except... 210.12(C)- AFCI protection shall be provided for all 15 and 20 amp 120 volt receptacle outlets located in guest rooms of hotel and motels. None protected at time of inspection.
|
ELE19-04387
| Rough-In Permanent Service | 12/6/2019 | 12/6/2019 | 12/6/2019 2:36:19 PM | P | NR |
|
|
Inspect underground secondary stub up and ground system Phone #: ###-#### Inspection requested via web by John Mittleider Primary under ground only ready.
|
ELE19-04387
| Electrical Rough-In | 12/6/2019 | 12/6/2019 | 12/6/2019 2:36:03 PM | P | PASS |
|
|
Inspect underground secondary stub up and ground system Phone #: ###-#### Inspection requested via web by John Mittleider Primary underground from transformer to pedistal locations rough in ok cover.
|
ELE19-02715
| Electrical Rough-In | 12/5/2019 | 12/6/2019 | 12/6/2019 11:38:49 AM | A | PASS |
|
|
Bill Peace is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Phase 3 office walls rough in ok cover.
|
ELE19-03117
| Final | 12/4/2019 | 12/6/2019 | 12/6/2019 10:54:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dave Brueggemann Final ok
|
ELE19-03541
| Final | 12/6/2019 | 12/6/2019 | 12/6/2019 9:44:00 AM | A | PASS |
|
|
Boise Centre removed their extension cord from the ceiling. Please call Luke if you have any other questions. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Final ok
|
ELE19-03533
| Final | 12/5/2019 | 12/6/2019 | 12/6/2019 9:08:28 AM | A | PASS |
|
|
Final inspection Contact John (Homey) McElroy Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek General foreman stated no signature needed. Final ok
|