Inspections for the day of: Thursday, December 7, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01366 BLD-Framing/Rough-in12/6/200012/7/200012/7/2000 12:00:00 AMAPART
###-#### ceiling tile.all ok except kitchen area requires addl work,note hoods will require 2nd bolt to angle iron at top of hood also addnl work above soup bar will be done. 12/7/2000 11:23:40 AM
BLD00-01366 BLD-Framing/Rough-in12/6/200012/7/200012/7/2000 12:00:00 AMAPART
###-#### ceiling tileall ok except some areas in kitchen req addl work,also note grease hoods require addl bolting at top of hoods all hoods and addnl work over soup area. 12/7/2000 11:30:39 AM
BLD00-03217 BLD-Framing/Rough-in12/6/200012/7/200012/7/2000 12:00:00 AMAFAIL
###-####c/n posted. 12/7/2000 12:36:58 PM
BLD00-03302 BLD-Energy code compliance12/6/200012/7/200012/7/2000 12:00:00 AMAPASS
###-####
BLD00-03071 BLD-Framing/Rough-in12/6/200012/7/200012/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/06/2000 at 16:03:45. Contact: ###-####.
BLD00-02384 BLD-Final12/7/200012/7/200012/7/2000 12:00:00 AMPFAIL
johnny ###-#### fn occ. c/n by 408 12/7/2000 3:59:15 PM
BLD00-02984 BLD-Framing/Rough-in12/7/200012/7/200012/7/2000 12:00:00 AMPPASS
###-####= george fr
BLD00-02985 BLD-Framing/Rough-in12/7/200012/7/200012/7/2000 12:00:00 AMPPASS
###-#### fr insp george
BLD00-03020 BLD-Framing/Rough-in12/7/200012/7/200012/7/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/07/2000 at 09:27:58. Contact: .
BLD00-03021 BLD-Framing/Rough-in12/7/200012/7/200012/7/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/07/2000 at 09:29:02. Contact: .
BLD00-03431 BLD-Framing/Rough-in12/7/200012/7/200012/7/2000 12:00:00 AMPPASS
Larry ###-####