FIR04-00616
| INSP-Supply line flush | 12/6/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | A | PART |
|
|
SAM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Wrong permit called in - this is for the UG inspection - see FIR04-00554 12/7/2004 3:32:28 PM
|
FIR04-00332
| INSP-Sprinkler Rough-in/Hydro | 12/6/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 3:16:20 PM. Contact: ###-####. Final okay; EC sidewall installed at counter 12/7/2004 3:29:39 PM
|
BLD04-01386
| FIRE-Conference | 12/7/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PART |
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Barbara MooreMet with GC about extinguisher placement in shell and east TI space 12/7/2004 3:37:21 PM
|
FIR04-00661
| INSP-Sprinkler Rough-in/Hydro | 12/7/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PART |
|
|
Started air test at 2 pm with 40 psi on preaction system 12/7/2004 3:35:25 PM
|
FIR04-00554
| INSP-Final Inspection | 12/7/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PASS |
|
|
UG flush and hydro okay - final okay 12/7/2004 3:38:09 PM
|
FIR04-00719
| INSP-Final Inspection | 12/2/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PASS |
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Jan Rice After hour inspection from 11 pm to 1 am; final okay as per plans 12/8/2004 10:28:33 AM
|