BLD04-01513
| BLD-Framing/Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 12:58:37 PM. Contact: ###-####.
ok to cover interior walls.
Contractor to leave all "hard" ceiling areas uncovered for future sprinkler insp. 12/7/2004 11:55:47 AM
|
BLD04-02578
| BLD-Framing/Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | A | PART |
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Jan Rice
1st floor fire walls @ face of both interiors ok 12/7/2004 11:58:22 AM
|
BLD04-02614
| BLD-Footing | 12/7/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 7:06:32 AM. Contact: ###-####.
|
BLD04-01579
| BLD-Final | 12/7/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PASS |
|
|
Amy; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD04-02614
| BLD-Footing | 12/7/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PART |
|
|
Donnie; Phone #: ###-#### Internet Inspection Request from: Jan Rice
footings only ok.
contractor to string right front property line for stemwall inspection 12/7/2004 1:35:00 PM
|
MEC04-03407
| Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 12:00:00 AM | P | PART |
|
|
Debbie; Phone #: ###-#### Internet Inspection Request from: Jan Rice
gas pressure tests ok X 4.
C/n left on site for firewall issues 12/7/2004 3:41:56 PM
|