ELE05-04308
| Electrical Rough-In | 12/7/2005 | 12/7/2005 | 12/7/2005 4:29:46 PM | P | CANC |
|
|
jeff Note: underground; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles did in morning
|
ELE05-04386
| Electrical Rough-In | 12/7/2005 | 12/7/2005 | 12/7/2005 4:29:10 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 9:46:38 AM. Contact: ###-####. walls only ok to cover
|
ELE05-03338
| Final | 12/7/2005 | 12/7/2005 | 12/7/2005 4:06:19 PM | P | PASS |
|
|
daryl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to final
|
ELE05-04236
| Final | 12/7/2005 | 12/7/2005 | 12/7/2005 3:11:13 PM | P | FAIL |
|
|
ceiling/final////stu; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called contr, left corr notice, 300.11(A) ceiling wires shall be identified, 800.154(A) abandoned comm wires shall be removed, 210.62 show room recpts shall be installed, 314.25 boxes shall have covers installed, 404.9(A) sws shall have covers installed,406.5 recpts shall shall have faceplates installed,408.4 circuit directory shall be complete and detailed, 800.24 communications cable shall be supported, BCC no violations shall be retained
|
ELE05-03956
| Final | 12/7/2005 | 12/7/2005 | 12/7/2005 2:03:44 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 7:52:02 AM. Contact: ###-####. see ri
|
ELE05-03344
| Final | 12/7/2005 | 12/7/2005 | 12/7/2005 1:45:13 PM | P | PASS |
|
|
spencer; Phone #: ###-#### Internet Inspection Request from: Barbara Moore corr made, ok to final
|
ELE05-04319
| Final | 12/6/2005 | 12/7/2005 | 12/7/2005 1:10:01 PM | P | NH |
|
|
DAN ; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called contr, nh, not done
|
ELE05-04290
| Electrical Rough-In | 12/7/2005 | 12/7/2005 | 12/7/2005 12:18:59 PM | P | PASS |
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corrections made, ric walls only ok
|
ELE05-04131
| Electrical Rough-In | 12/6/2005 | 12/7/2005 | 12/7/2005 11:44:26 AM | A | PASS |
|
|
any questions please call Ed Schallock; Phone #: ###-#### Internet Inspection Request from: Jeff Radford u/g ok to cover to light pole, and under slab
|
ELE05-04266
| Final | 12/6/2005 | 12/7/2005 | 12/7/2005 10:07:00 AM | A | CANC |
|
|
NEED FINAL INSPECTION. ADDED CAN LIGHT AND OUTLETS TO SECOND FLOOR. STEVE WITH STERLING CONSTRUCTION WILL BE ON SITE. THANK YOU. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH see ri
|
ELE05-04308
| Electrical Rough-In | 12/7/2005 | 12/7/2005 | 12/7/2005 10:05:55 AM | A | PASS |
|
|
inspection for underground conduit. located in the Nazareth Retreat Center parking area. Jeff on site ###-####; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to cover u/g
|
ELE05-04061
| Conference | 12/6/2005 | 12/7/2005 | 12/7/2005 9:10:18 AM | A | DONE |
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa reviewed wall spacing, 1 1/4", circuits etc
|
ELE05-04269
| Electrical Rough-In | 12/6/2005 | 12/7/2005 | 12/7/2005 9:09:03 AM | A | PASS |
|
|
mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ric ok, talked to contr to change 1 box and a couple 1 1/4"
|
ELE05-04269
| Permanent Service | 12/6/2005 | 12/7/2005 | 12/7/2005 8:33:50 AM | A | PASS |
|
|
mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s o/h n ok
|
ELE05-04232
| Rough-In Permanent Service | 12/6/2005 | 12/7/2005 | 12/7/2005 8:33:05 AM | A | CANC |
|
|
MORGAN; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called contr, no access, he said bkr for power not identified yet either
|
ELE05-04266
| Electrical Rough-In | 12/7/2005 | 12/7/2005 | 12/7/2005 12:00:00 AM | A | PASS |
|
|
NEED FINAL INSPECTION. ADDED CAN LIGHT AND OUTLETS TO SECOND FLOOR. STEVE WITH STERLING CONSTRUCTION WILL BE ON SITE. THANK YOU. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH met with builder, need to fix 1 1/4" 3 plcs, ric ok
|
ELE05-03956
| Electrical Rough-In | 12/7/2005 | 12/7/2005 | 12/7/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 7:52:02 AM. Contact: ###-####. clg cover upstairs ok
|