Inspections for the day of: Thursday, December 7, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02436 BLD-Final12/6/200612/7/200612/7/2006 4:19:48 PMPNR
mike - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Fire/life/safety failed.
BLD06-02011 BLD-Framing/Rough-in12/6/200612/7/200612/7/2006 3:44:45 PMPPART
Scheduled by a contractor via Hello! on 12/6/2006 at 2:40:43 PM. Contact: ###-####. Shear nailing on roof. ok to cover. Noted contractor had changed type of truss used. Approved engimeering from manufacturer on site. Noted to contractor to have changes made with structural engineer also.
BLD06-02501 BLD-Framing/Rough-in12/7/200612/7/200612/7/2006 3:01:57 PMPFAIL
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to remove all screws connecting top track of steel stud walls to ceiling grid structure. c/n posted. ok to one side only.
BLD06-01690 BLD-Framing/Rough-in12/7/200612/7/200612/7/2006 2:47:43 PMPPASS
Scheduled by a contractor via Hello! on 12/7/2006 at 7:31:50 AM. Contact: ###-####. ok to insul.
BLD06-01688 BLD-Final12/7/200612/7/200612/7/2006 2:35:39 PMPPASS
Calvin; Phone #: ###-####, call 1st for access Internet Inspection Request from: Cathy Weisshaupt
BLD06-01688 DOC - Permit Finaled12/7/200612/7/200612/7/2006 2:35:26 PMPPASS
BLD06-02599 BLD-Framing/Rough-in12/7/200612/7/200612/7/2006 2:17:34 PMPPASS
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Phase 1 interior walls. Need to add bracing to top of walls and fireblock at top of walls.
BLD06-02672 BLD-Framing/Rough-in12/6/200612/7/200612/7/2006 10:30:45 AMAPASS
Fadil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD05-00317 BLD-Energy code compliance12/6/200612/7/200612/7/2006 10:08:24 AMAPASS
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. North wall, eastwall 2nd floor, southwall.
BLD06-02904 BLD-Framing/Rough-in12/6/200612/7/200612/7/2006 9:11:41 AMANR
gary; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs ri insp. prior to framing insp. Did perforem a preliminary walk through and awnsered questions from contractor.
BLD06-02501 BLD-Conference12/6/200612/7/200612/7/2006 8:40:13 AMACANC
BLD06-02501 BLD-Framing/Rough-in12/7/200612/7/200612/7/2006 8:39:59 AMANR
No access, contractor noted that doors would be open at 7:00am. no insp done.