ELE07-01160
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 5:36:00 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:30:07 AM. Contact: ###-####. . 1. site is not ready at this time. . . 2. still under construction. .
|
ELE07-01158
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 5:34:59 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:28:42 AM. Contact: ###-####. . 1. final ok, see the survey note. . . 2. survey note --- recep spacing in one room, 6' -- 12' rule, 210.52. .
|
ELE07-01174
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 4:38:03 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:27:02 AM. Contact: ###-####. . 1. final ok. . . 2. survey note -- recep spacing in one room, 6' -- 12' rule, 210.52. .
|
ELE07-01154
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 3:36:12 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:25:27 AM. Contact: ###-####. . 1. 110.26.A. Working clearance of the panel ---- remove the shelf and closet rod that are above the panel in the laundry room. .
|
ELE07-02246
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 3:04:31 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:23:53 AM. Contact: ###-####. . 1. panel in closet mstr bdrm, general contractor stated that they would build a wall to seperate the panel from the closet. .
|
ELE07-02246
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 3:02:43 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:23:53 AM. Contact: ###-####. . 1. 240.24.D. Overcurrent devices shall not be located in clothes closet (mstrbdrm). . . 2. The rest of the inspection was ok, with the exception of the survey note. . . 3. survey note --- recep spacing in mstr bdrm. .
|
ELE07-01146
| Electrical Rough-In | 12/7/2007 | 12/7/2007 | 12/7/2007 2:57:10 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:22:00 AM. Contact: ###-####. . 1. ri ok. .
|
ELE07-04015
| Final | 12/6/2007 | 12/7/2007 | 12/7/2007 1:05:44 PM | P | NH |
|
|
TOBY SERVICE CHANGE Phone #: ###-#### Internet Inspection Request from: Sean DeLacy . 1. no access, spoke with contractor and let him know how to make an appointment for the first slot in the am or pm. . . 2. they will reschedule for monday or tuesday. .
|
ELE07-03742
| Final | 12/7/2007 | 12/7/2007 | 12/7/2007 12:54:29 PM | P | PASS |
|
|
final on new service, new shop and service on house. Phone #: ###-#### Internet Inspection Request from: Andy Rose . 1. final ok. .
|
ELE07-03188
| Final | 12/6/2007 | 12/7/2007 | 12/7/2007 11:55:41 AM | A | PASS |
|
|
Ed Phone #: ###-#### . 1. final ok. .
|
ELE07-04041
| Rough-In Permanent Service | 12/6/2007 | 12/7/2007 | 12/7/2007 10:13:08 AM | A | CANC |
|
|
tom Phone #: ###-#### . 1. no permanent service at this time, see rough-in for this date. .
|
ELE07-04041
| Electrical Rough-In | 12/7/2007 | 12/7/2007 | 12/7/2007 10:11:59 AM | P | PASS |
|
|
tom Phone #: ###-#### . 1. underground from the house to the garage ok. .
|
ELE07-04001
| Rough-In Permanent Service | 12/6/2007 | 12/7/2007 | 12/7/2007 10:01:21 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Alan Lusk . 1. ri ok. . . 2. p/s u/g n ok. .
|
ELE07-04042
| Rough-In Permanent Service | 12/6/2007 | 12/7/2007 | 12/7/2007 9:32:16 AM | A | CANC |
|
|
tom Phone #: ###-#### . 1. there is no permanent service at this time, see the rough-in for this date. .
|
ELE07-04042
| Electrical Rough-In | 12/7/2007 | 12/7/2007 | 12/7/2007 9:30:17 AM | P | PASS |
|
|
tom Phone #: ###-#### . 1. underground from house to garage is ok. .
|
ELE07-03868
| Electrical Rough-In | 12/6/2007 | 12/7/2007 | 12/7/2007 8:35:18 AM | A | FAIL |
|
|
U-Fer Ground Inspection only. Concrete guys want to pour after 1pm Friday, December 07,2007. Thank you. Phone #: ###-#### Internet Inspection Request from: Paula Gietzen . 1. Electrode not in proper position, needs to be on the bottom of the footing. .
|