ESC07-01449
| Site Final | 12/7/2007 | 12/7/2007 | 12/10/2007 1:00:02 PM | A | CANC |
|
|
|
ESC07-01472
| Site Preparation | 12/6/2007 | 12/7/2007 | 12/7/2007 2:15:15 PM | P | DONE |
|
|
Construction has not started yet.
|
ESC07-01186
| BMP Violation | 12/5/2007 | 12/7/2007 | 12/7/2007 12:56:12 PM | A | PASS |
|
|
Issues on previous c/n have been addressed.
|
ESC07-01185
| Site Preparation | 12/6/2007 | 12/7/2007 | 12/7/2007 11:47:29 AM | P | PART |
|
|
Spoke with RP about adding some top dressing to the existing construction entrance and to address some mud and dirt trackout from site onto Garfield. Perimeter control is in place, ESC sign is posted and port a potty is on site. Clean up and top dressing will be addressed today.
|