Inspections for the day of: Friday, December 7, 2007.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01449 Site Final12/7/200712/7/200712/10/2007 1:00:02 PMACANC
ESC07-01472 Site Preparation12/6/200712/7/200712/7/2007 2:15:15 PMPDONE
Construction has not started yet.
ESC07-01186 BMP Violation12/5/200712/7/200712/7/2007 12:56:12 PMAPASS
Issues on previous c/n have been addressed.
ESC07-01185 Site Preparation12/6/200712/7/200712/7/2007 11:47:29 AMPPART
Spoke with RP about adding some top dressing to the existing construction entrance and to address some mud and dirt trackout from site onto Garfield. Perimeter control is in place, ESC sign is posted and port a potty is on site. Clean up and top dressing will be addressed today.