BLD11-02696
| FIRE-Final Inspection | 12/7/2011 | 12/7/2011 | 12/8/2011 10:50:40 AM | P | PART |
|
|
Reviewed permit documents on site, noted missing max. occupant load signs, need approved hardware at the second exit east side, post "door to remain..."signage. PFE's provided.
|
FIR11-00639
| INSP-Sprinkler Rough-in | 12/7/2011 | 12/7/2011 | 12/7/2011 2:55:05 PM | P | PART |
|
|
Overhead work at suite 330 approved for ceiling cover.
|
FIR08-00604
| INSP-Alarm Testing | 12/7/2011 | 12/7/2011 | 12/7/2011 2:16:04 PM | P | NR |
|
|
Low air pressure switches at dry systems not set, DH did not release, noted 4th floor dry system LAPS activated a general alarm condition.
|
FIR11-00534
| INSP-Sprinkler Rough-in/Hydro | 12/7/2011 | 12/7/2011 | 12/7/2011 2:12:31 PM | P | FAIL |
|
|
Antifreeze system hydrostatic test failed due to visible leakage and a pressure drop at the guage.
|
FIR11-00618
| INSP-Sprinkler Rough-in/Hydro | 12/7/2011 | 12/7/2011 | 12/7/2011 2:11:05 PM | P | PART |
|
|
Rough-in passed with the exception of two missing hangers and sprinklers at two locations to be changed to the correct temp. rating. Corrections can be verified at final inspection prior to occupancy.
|
BLD11-02696
| FIRE-Final Inspection | 12/7/2011 | 12/7/2011 | 12/7/2011 12:25:20 PM | A | NR |
|
|
C/N incomplete
|
FIR11-00534
| INSP-Sprinkler Rough-in/Hydro | 12/7/2011 | 12/7/2011 | 12/7/2011 12:19:34 PM | A | PART |
|
|
Overhead hydrostatic testing for the basement and 1st floor levels passed.
|
FIR11-00534
| INSP-Sprinkler Rough-in | 12/6/2011 | 12/7/2011 | 12/7/2011 12:17:31 PM | A | PART |
|
|
Completed overhead inspection for the 1st floor. Correction items include; 3 upright heads at the antifreeze system elevated entryway west side, provide revised plans including changes for sprinkler protection at the test chamber 138 within the calc area and added sw heads for garage doors, add missing seismic bracing at the 3" main, verify correct size hangers for 4" main. Drop ceiling areas okayed for cover.
|