BLD15-02243
| FIRE-Conference | 12/7/2015 | 12/7/2015 | 12/7/2015 2:53:22 PM | P | DONE |
|
|
I spoke to the contractor and to the architect about the possible need for resumbittals of the building plans since they do not show the gas room. I suggested that they contact both building and fire review personell. I went over IFC chapter 53 requirements with the job superintendant. I was at the project due to a FIR permit for the single sprinkler head in the gas closet.
|
NAF15-00024
| INSP-Final | 12/7/2015 | 12/7/2015 | 12/7/2015 1:47:42 PM | P | CANC |
|
|
No water yet
|
BLD15-01259
| FIRE-Final Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 1:46:49 PM | P | PASS |
|
|
Life safety passed
|
FIR15-00828
| INSP-Sprinkler Rough-in | 12/7/2015 | 12/7/2015 | 12/7/2015 12:05:03 PM | P | PASS |
|
|
See the city approved plans for underground supply line piping that was inspected today and is ok for cover.
|
FIR15-00854
| INSP-Final Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 12:03:58 PM | P | PASS |
|
|
Permit finaled
|
FIR15-00660
| INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/7/2015 | 12/7/2015 11:41:14 AM | P | PASS |
|
|
Overhead hydro tests passed
|
FIR15-00662
| INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/7/2015 | 12/7/2015 11:40:15 AM | P | PASS |
|
|
Rough-in passed. Need to provide additional bracing at the FDC. Can not cover until a tenting inspection has passed.
|
FIR15-00663
| INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/7/2015 | 12/7/2015 11:35:41 AM | P | PASS |
|
|
Rough-in passed. Need to provide additional bracing at the FDC. Can not cover until a tenting inspection has passed.
|
FIR15-00666
| INSP-Sprinkler Rough-in | 12/7/2015 | 12/7/2015 | 12/7/2015 11:34:20 AM | P | PASS |
|
|
Rough-in passed. Need to provide additional bracing at the FDC. Can not cover until a tenting inspection has passed.
|
BLD15-04241
| FIRE-Final Inspection | 12/4/2015 | 12/7/2015 | 12/7/2015 9:25:01 AM | A | PASS |
|
|
Life safety passed
|
FIR15-00760
| INSP-Sprinkler Rough-in | 12/7/2015 | 12/7/2015 | 12/7/2015 9:10:05 AM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|