NAF15-00035
| INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/7/2015 | 12/7/2015 4:38:22 PM | P | PASS |
|
|
Hydrostatic test completed satisfactory (reading at 2:10pm 212 psi, again at 4:14pm 212psi) Rough in inspection completed satisfactory, ok to cover. **To be verified at final** two dry pendants in cooler, 4 dry sidewalls at entrances and one regular sidewall in electrical room. Stubs were present at roughin
|
NAF15-00035
| INSP-Supply line flush | 12/7/2015 | 12/7/2015 | 12/7/2015 11:26:51 AM | A | DONE |
|
|
Undergound supply line flush completed ok. Flushed for 3.5 minutes no significant debris.
|
NAF15-00024
| INSP-Final | 12/6/2015 | 12/7/2015 | 12/7/2015 7:18:47 AM | A | CANC |
|
|
Please call Jake when you are on your way. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|