FIR16-00440
| INSP-Sprinkler Rough-in/Hydro | 12/6/2016 | 12/7/2016 | 12/7/2016 3:02:25 PM | P | PASS |
|
|
Overhead hydro test passed
|
BLD16-00766
| FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 2:14:07 PM | A | PART |
|
|
A fire watch is to be inplace as per Fire Dept and the contractor discussion for tonight. I'm scheduled for a final re-inspection for tomorrow morning for the testing of the two duct smoke detectors. Jim Sly is going to cover the main exit door hardware. I need to verify with the Fire Dept that all items for their tank inspection have be addressed. All other items appear ok.
|
BLD16-00647
| FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 12:56:14 PM | A | PASS |
|
|
Life safety passed
|
BLD16-02122
| FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 12:08:18 PM | A | FAIL |
|
|
Provide tagged and mounted fire extinguisher as discussed.
|
BLD06-02323
| FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 9:43:40 AM | A | PASS |
|
|
bldg 2 suite 201 life safety passed
|