Inspections for the day of: Wednesday, December 7, 2016.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-01757 BLD-Foundation12/6/201612/7/201612/7/2016 3:41:15 PMPPASS
Rebar // Steve Phone #: ###-####. Perimeter stemwalls for bldg. 100.
BLD16-00229 BLD-Conference12/7/201612/7/201612/7/2016 3:24:51 PMPPEND
Duy-pleae do as late as possible because the plumbing will be early PM Phone #: ###-####. Everything ok, pending plumbing issues need resolved.
ESC16-00392 Site Final12/7/201612/7/201612/7/2016 2:25:43 PMPDONE
ESC16-00392 DOC - Permit Finaled12/7/201612/7/201612/7/2016 2:25:34 PMPPASS
BLD16-00963 BLD-Final12/6/201612/7/201612/7/2016 2:24:56 PMPPASS
miguel Phone #: ###-####
BLD16-00963 DOC - Permit Finaled12/7/201612/7/201612/7/2016 2:24:45 PMPPASS
BLD16-02649 BLD-Footing12/6/201612/7/201612/7/2016 1:45:35 PMPPASS
Dane Phone #: ###-####
BLD15-01788 BLD-Conference12/7/201612/7/201612/7/2016 1:36:50 PMPDONE
DO NOT VOID/EXPIRE PERMIT. Need to know if any work was done and/or if Panache Hair Studio & Day Spa are in the space. TI/Occupancy permit Phone #: ###-####. Tenant still occupy's space. It APPEARS that work has been completed. Have not been able to verify. Owner does not return my phone calls.
BLD16-03924 BLD-Final12/7/201612/7/201612/7/2016 1:04:13 PMPNR
Jamey ###-####. Needs fire/life/safety final first.
BLD16-00525 BLD-Final12/6/201612/7/201612/7/2016 12:53:10 PMAFAIL
Richard Phone #: ###-####. East exterior door exterior landing not at same elevation as interior slab. Correction notice issued.
BLD15-02837 BLD-Final12/6/201612/7/201612/7/2016 12:51:31 PMAFAIL
Richard Phone #: ###-####. Submit plan mod to modify scope of work showing the removal of the 1hr. ceiling assembly from the shell scope of work. THis will have to completed on the tenant improvement work. Aslo the west exit door exterio landing needs to be at the same elevation as the interior slab.
BLD16-04014 BLD-Framing/Rough-in12/6/201612/7/201612/7/2016 10:46:23 AMAPASS
Mike Phone #: ###-####. Interior steel stud half walls for floral work center ok.
BLD16-01109 BLD-Final12/6/201612/7/201612/7/2016 10:18:51 AMANR
Chad Phone #: ###-####
BLD16-04180 BLD-Conference12/2/201612/7/201612/7/2016 10:08:28 AMADONE
Phone #: ###-#### Inspection requested via web by Scott Smith
BLD16-04180 DOC - Permit Finaled12/7/201612/7/201612/7/2016 10:08:13 AMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD16-03819 BLD-Framing/Rough-in12/7/201612/7/201612/7/2016 9:48:20 AMAPASS
Phone #: ###-#### Inspection requested via web by Richard Wilson. Interior steel stud framed walls and soffits.
BLD16-03769 BLD-Wall Bracing12/6/201612/7/201612/7/2016 8:53:12 AMAPASS
Shear // Joe Phone #: ###-####
BLD16-02537 BLD-Energy code compliance12/6/201612/7/201612/7/2016 8:43:40 AMAPASS
Brett Phone #: ###-####