BLD17-02710
| FIRE-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 3:04:31 PM | P | PASS |
|
|
Fire sprinkler inspection complete, fire alarm inspection complete to include mag-lock interface and release with fire alarm activation, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
BLD17-03471
| FIRE-Final Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 3:03:00 PM | P | PASS |
|
|
Partial final life fire safety inspection complete. Racking in warehouse to be installed at a later date, fire sprinkler permit for racks cannot be completed until racks are installed. Use of racks is not authorized until inspection has been performed and passed. TCO authorized for 30 days per conversation with Scott Arellano. (PER JIM PAGE THIS IS GOOD FOR FULL PASS 1-19-18)
|
FIR17-00609
| INSP-Final Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 2:59:58 PM | P | PASS |
|
|
Final fire sprinkler inspection for this permit area passed/complete.
|
FIR17-00679
| INSP-Sprinkler Rough-in/Hydro | 12/7/2017 | 12/7/2017 | 12/7/2017 1:37:33 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, overhead fire sprinkler piping approved for cover. Underground flush was completed during this inspection request. Underground hydrostatic test could not be completed due to leakage going past the water purveyor supplied valve. Installing contractor will need to inform water purveyor about issue of water passing by when underground valve is shut.
|
BLD17-04345
| FIRE-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 10:53:25 AM | A | PASS |
|
|
no fire sprinklers, no fire alarms, fire extinguisher will be mounted in discussed location and tagged accordingly. Final life fire safety for this permit passed/complete.
|
FIR17-00664
| INSP-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 10:24:27 AM | A | PASS |
|
|
Final fire alarm inspection for demo work complete.
|
FIR17-00635
| INSP-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 10:24:00 AM | A | PASS |
|
|
Final fire alarm inspection for area of work passed/complete.
|
FIR16-00747
| INSP-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 10:23:31 AM | A | PASS |
|
|
Final fire alarm inspection for area of work passed/complete.
|
BLD17-02170
| FIRE-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 9:20:28 AM | A | PART |
|
|
Fire sprinkler inspection for area of work complete, fire alarm inspection for area of work complete, fire extinguishers are mounted with current inspection tags. Final life fire safety complete for area of work. Tenant space will remain in TCO status until core and shell is complete and finaled. Tenant space can be finaled when core and shell is complete and finaled.
|
BLD17-03798
| FIRE-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 8:58:42 AM | A | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is in place and will be tagged with an inspection tag accordingly. Final life fire safety inspection for this permit passed/complete.
|
FIR13-00178
| INSP-Final Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 8:17:01 AM | A | PASS |
|
|
Final fire alarm inspection for scope of work passed/complete.
|