ELE18-03320
| Electrical Rough-In | 12/7/2018 | 12/7/2018 | 12/7/2018 2:58:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Kount lobby hard lid in entrance, storage room walls, basement locker rooms hard lids rough in ok cover
|
ELE18-02489
| Final | 12/7/2018 | 12/7/2018 | 12/7/2018 2:56:11 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton BCC- Electrical permit from city of Boise required for elevator installation. 300.15- All boxes shall have covers, basement "L" shaped box and sump pump wiring. 250.30(A)(4)- The building or structure grounding electrode system shall be used for grounding seperately derived systems. Level 3 trans. Stairs from level 3 to 4 not complete nor is lighting for stairs. Will check with building inspector on this.
|
ELE18-04607
| Rough-In Permanent Service | 12/6/2018 | 12/7/2018 | 12/7/2018 11:31:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover p/s u/g n ok
|
ELE17-03293
| Final | 12/6/2018 | 12/7/2018 | 12/7/2018 11:00:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by A.M.E. Office Final ok
|
ELE17-03291
| Final | 12/6/2018 | 12/7/2018 | 12/7/2018 11:00:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by A.M.E. Office Final ok
|
ELE18-02489
| Final | 12/6/2018 | 12/7/2018 | 12/7/2018 9:45:08 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Called contact, no answer, mail box full. Must recall when available.
|