ELE18-04195
| Electrical Rough-In | 12/4/2018 | 12/7/2018 | 12/7/2018 1:33:18 PM | P | PASS |
|
|
Please call Kelly Kolb, the foreman on site, when you are on your way. He can be reached at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Ashley White listing only ok
|
ELE18-04402
| Electrical Rough-In | 12/7/2018 | 12/7/2018 | 12/7/2018 1:26:00 PM | P | PASS |
|
|
Floor heat rough in Mstr. Bath Phone #: ###-#### Inspection requested via web by Emmet Bushman floor heat ok to cover
|
ELE18-04532
| Final | 12/6/2018 | 12/7/2018 | 12/7/2018 1:00:09 PM | P | PASS |
|
|
Please call the homeowner Brian at ###-#### on your way With any questions please call Andrew at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan A/C relocated and prewire hot tub only final ok
|
ELE18-04532
| Electrical Rough-In | 12/6/2018 | 12/7/2018 | 12/7/2018 12:59:35 PM | P | PASS |
|
|
Please call the homeowner Brian at ###-#### on your way With any questions please call Andrew at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan rough in of a/c and prewire for hot tub only ok
|
ELE18-04637
| Final | 12/6/2018 | 12/7/2018 | 12/7/2018 12:18:36 PM | A | NR |
|
|
Please call Rafael for part final phase 1 of B37. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Several areas not ready for electrical install. 2nd floor elevator lobby ceiling. 1st floor restrooms missing access in ceiling for light J-box. 1st floor main lobby flooring not in place for floor box install. Missing millwork for security desk and and South wall sink area. Misc walls unfinished and not ready for switch install. Sky bridge unfinished and open to elements. Power shall remain off untill widows installed.
|
ELE18-04637
| Electrical Rough-In | 12/7/2018 | 12/7/2018 | 12/7/2018 11:50:14 AM | P | PART |
|
|
Please call Rafael for part final phase 1 of B37. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 3rd floor cubical reinspect. Corrections made on North side funiture. Receps checked on South side cubicals. Missing several lower covers through out. Will check to make sure they are installed at final. Roof top service recep needed for mini-split condensor units as per 210.63. Recep shall be accessible.(Refer to definition of accessible as applied to equipment. Shall not be guarded by locked doors)
|
ELE18-01206
| Final | 12/6/2018 | 12/7/2018 | 12/7/2018 11:41:20 AM | A | PART |
|
|
Final for underground. Phone #: ###-#### Inspection requested via web by Rafael Castillo Partial final ok. Final permit when ELE18-04637 is complete. Underground on this permit only and associated with 1st floor underfloor wiring method.
|