BLD98-02277
| INSP - Concrete | 12/8/1998 | 12/8/1998 | 12/8/1998 12:00:00 AM | P | FAIL |
|
|
supt. not onsite...ftgs pending spec insp reports.
|
BLD98-02401
| INSP - Framing/Rough-in | 12/8/1998 | 12/8/1998 | 12/8/1998 12:00:00 AM | P | PART |
|
|
JACK ###-#### RE-INSP FR...still need to complete firestops at 1hr.
|
BLD98-02402
| INSP - Framing/Rough-in | 12/8/1998 | 12/8/1998 | 12/8/1998 12:00:00 AM | P | PART |
|
|
JACK ###-#### RE-INSP FR...need firestops
|
BLD98-02608
| INSP - Final | 12/8/1998 | 12/8/1998 | 12/8/1998 12:00:00 AM | P | FAIL |
|
|
TIM DIGITAL PAGER ###-#### FN OCC-DO THIS LAST IF YOU WANT c/n smoke dets
|
BLD98-02707
| INSP - Final | 12/8/1998 | 12/8/1998 | 12/8/1998 12:00:00 AM | P | FAIL |
|
|
TIM ###-#### DIGITAL PAGER FN FOR OCC need floor insul per mec check
|
BLD98-03473
| INSP - Framing/Rough-in | 12/8/1998 | 12/8/1998 | 12/8/1998 12:00:00 AM | P | FAIL |
|
|
conf only re frame insp, need complete other insp's
|