ELE99-04321
| Electrical Rough-In | 12/7/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 09:20:21. Contact: ###-####. Protection and 360 deg. Had conf.
|
ELE99-04171
| Electrical Rough-In | 12/7/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | A | PASS |
|
|
MITCH ###-#### R/I ok no closet in master bedroom.
|
ELE99-03482
| Final | 12/7/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | A | FAIL |
|
|
BRENDA ###-#### 1 ST AND 3RD FLOOR PLEASE CALL RICK ###-#### IF ANY QUESTIONS ON FURNITURE No corner covers.
|
ELE99-04410
| Electrical Rough-In | 12/7/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | A | PART |
|
|
###-#### or cell ###-#### Partial R/I ok back portions.
|
ELE99-03592
| Electrical Rough-In | 12/7/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 14:02:15. Contact: ###-####. R/I ok check box fill of switch on final.
|
ELE99-02089
| Final | 12/8/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | P | FAIL |
|
|
john ###-####-reinspection Grounding.
|
ELE99-03179
| Final | 12/8/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | P | FAIL |
|
|
john ###-#### reinspection Grounding.
|
ELE99-02593
| Final | 12/8/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/08/1999 at 08:14:04. Contact: ###-####. Final ok no card on job.
|
ELE99-04416
| Electrical Rough-In | 12/8/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | P | FAIL |
|
|
Frank ###-#### call for access hour or so ahead Guy kit light at panel recep. Required.
|
ELE99-02877
| Electrical Rough-In | 12/8/1999 | 12/8/1999 | 12/8/1999 12:00:00 AM | P | PASS |
|
|
kelly --###-#### re-insp r/I Partial R/I ok.
|