BLD00-02451
| BLD-Framing/Rough-in | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | A | NR |
|
|
###-#### ele c/n 12/8/2000 9:04:33 AM
|
BLD00-02493
| BLD-Framing/Rough-in | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 15:02:25. Contact: ###-####.
|
BLD00-01563
| BLD-Concrete | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 15:08:37. Contact: ###-####. neeed plan change for deletion of #3 24 oc at bottom of waffel slab. 12/8/2000 3:34:08 PM
|
BLD00-02989
| BLD-Final | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | FAIL |
|
|
Shane ###-#### ubc 509.2 mim 42 inch gaurd railling height not per plan or code. 12/8/2000 2:36:17 PM
|
BLD00-03476
| BLD-Foundation | 12/8/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 08:11:11. Contact: ###-####. delph of ft need back fill at final. 12/8/2000 2:12:05 PM
|
BLD00-00944
| BLD-Framing/Rough-in | 12/8/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PART |
|
|
###-#### call to meet there need other insp. aprovals ok to insulate upon those aprovals. 12/11/2000 9:56:01 AM
|