Inspections for the day of: Friday, December 8, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-02169 Groundwork12/7/200012/8/200012/8/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/07/2000 at 15:17:52. Contact: ###-####. ti up front center unit 12/8/2000 9:14:44 AM
PLM00-02928 Final12/7/200012/8/200012/8/2000 12:00:00 AMAPASS
key on window sill on right side of door ###-####
PLM00-04198 Sprinkler (Final)12/7/200012/8/200012/8/2000 12:00:00 AMPFAIL
after 3 ###-#### dcva nottested, expose connections to main 12/8/2000 3:13:40 PM
PLM00-04203 Sprinkler (Final)12/7/200012/8/200012/8/2000 12:00:00 AMPFAIL
###-#### dcva not tested, expose connections to main 12/8/2000 3:14:11 PM
PLM00-01932 Final12/7/200012/8/200012/8/2000 12:00:00 AMPPASS
###-#### after 4
PLM00-04209 Plumbing Rough-in12/8/200012/8/200012/8/2000 12:00:00 AMPPASS
###-####
PLM00-03808 Plumbing Rough-in12/8/200012/8/200012/8/2000 12:00:00 AMPPART
###-####- DEAN R/I part ri ok nee to move washer box out will recall 12/8/2000 2:45:27 PM
PLM00-04197 Water and/or Sewer12/8/200012/8/200012/8/2000 12:00:00 AMPPART
Added by Inspector: 330 On 12/8/2000 house up front is disconnected from the well and service is run, the apt. in the back has a service run but it isn't disconnected from the well yet, the service piping is capped outside the building
PLM00-04212 Water and/or Sewer12/8/200012/8/200012/8/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 12/8/2000 water service replacement, meter dcva, test ports to be plugged, to connection outside the building.