PLM00-02169
| Groundwork | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 15:17:52. Contact: ###-####. ti up front center unit 12/8/2000 9:14:44 AM
|
PLM00-02928
| Final | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | A | PASS |
|
|
key on window sill on right side of door ###-####
|
PLM00-04198
| Sprinkler (Final) | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | FAIL |
|
|
after 3 ###-#### dcva nottested, expose connections to main 12/8/2000 3:13:40 PM
|
PLM00-04203
| Sprinkler (Final) | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | FAIL |
|
|
###-#### dcva not tested, expose connections to main 12/8/2000 3:14:11 PM
|
PLM00-01932
| Final | 12/7/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PASS |
|
|
###-#### after 4
|
PLM00-04209
| Plumbing Rough-in | 12/8/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-03808
| Plumbing Rough-in | 12/8/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PART |
|
|
###-####- DEAN R/I part ri ok nee to move washer box out will recall 12/8/2000 2:45:27 PM
|
PLM00-04197
| Water and/or Sewer | 12/8/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 12/8/2000 house up front is disconnected from the well and service is run, the apt. in the back has a service run but it isn't disconnected from the well yet, the service piping is capped outside the building
|
PLM00-04212
| Water and/or Sewer | 12/8/2000 | 12/8/2000 | 12/8/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 12/8/2000 water service replacement, meter dcva, test ports to be plugged, to connection outside the building.
|