ESC04-01052
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
talked to RP about putting some more gravel bags down, mud and dirt track out is being maintained 12/8/2004 11:14:47 AM
|
ESC04-00371
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
contacted RP about putting down some more gravel bags to stop the flow of water down the hill, mud and track out is being maitained. 12/8/2004 11:14:25 AM
|
ESC04-00814
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
talked to RP about putting out some more gravel bags, mud and dirt track out is being maintained. 12/8/2004 11:15:09 AM
|
ESC03-01646
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
talke to RP about putting out some more gravel bags. mud and dirt track out is being maintained. 12/8/2004 11:15:33 AM
|
ESC04-01194
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
talked to RP about putting out some more gravel bags. mud and dirt track out is being maintained. 12/8/2004 11:15:57 AM
|
ESC04-00984
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
left a message for the RP about the gravel bags near the driveway. will follow up. 12/8/2004 11:26:08 AM
|
ESC04-00719
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PART |
|
|
left a message for the RP, permit needs to be updated with correct RP and gravel bags need to be replaced. 12/8/2004 11:31:42 AM
|
ESC04-01283
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PART |
|
|
left a message for RP, permit needs to be updated with current RP, gravel bag needs to be placed as well. 12/8/2004 11:34:20 AM
|
ESC03-01336
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
site looks fine, but no signage, contacted RP. 12/8/2004 11:48:30 AM
|
ESC04-00340
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PASS |
|
|
site looks fine, but no signage, contacted RP. 12/8/2004 11:48:41 AM
|
ESC03-01557
| BMP Violation | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | A | PART |
|
|
c/n issued, construction entrance is not up to standards. contacted RP. 12/8/2004 12:30:44 PM 12/8/2004 12:37:39 PM
|
ESC04-00253
| Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | P | PART |
|
|
c/n issued. Franklin Supply delivery truck drove on and off of site causing track out, no sediment barrier along sidewalk and signage is not legible. contacted RP. 12/8/2004 2:48:33 PM 12/8/2004 2:48:45 PM
|
ESC04-01449
| Site Preparation | 12/8/2004 | 12/8/2004 | 12/8/2004 12:00:00 AM | P | PASS |
|
|
contacted RP about BMP installations. 12/8/2004 11:07:18 AM
|